Operating / Stabilized · Yas Island / Abu Dhabi, AZ, United Arab Emirates
- Capacity
- 20 MW
- Planned / design
- Verified
- Aug 25, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | Pure DC AUH01 Building 1 | Pure DC AUH01 Building 2 |
|---|---|---|
| Record type | Site | Site |
| Status | Operating / Stabilized | Entitled / Permitted |
| Location | Yas Island / Abu Dhabi, AZ, United Arab Emirates | Yas Island / Abu Dhabi, AZ, United Arab Emirates |
| Headline capacity | 20 MW · Planned / design | No reviewed public value |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | Pure Data Centres Group | Pure Data Centres Group |
| Utility | No reviewed public value | No reviewed public value |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Aug 25, 2026 | Aug 25, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Operating / Stabilized · Yas Island / Abu Dhabi, AZ, United Arab Emirates
Entitled / Permitted · Yas Island / Abu Dhabi, AZ, United Arab Emirates
Save public profiles to a device watchlist, then create a separate view-only link.