Operating / Stabilized · Alcalá de Henares / Madrid, MD, Spain
- Capacity
- —
- Verified
- Aug 25, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | Nabiax Alcalá ADC2 | Nabiax Alcalá ADC3 |
|---|---|---|
| Record type | Site | Site |
| Status | Operating / Stabilized | Proposed |
| Location | Alcalá de Henares / Madrid, MD, Spain | Alcalá de Henares / Madrid, MD, Spain |
| Headline capacity | No reviewed public value | 100 MW · Planned critical IT |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | Nabiax | Nabiax |
| Utility | No reviewed public value | No reviewed public value |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Aug 25, 2026 | Aug 25, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Operating / Stabilized · Alcalá de Henares / Madrid, MD, Spain
Proposed · Alcalá de Henares / Madrid, MD, Spain
Save public profiles to a device watchlist, then create a separate view-only link.