Partially operational · São Bernardo do Campo, SP, Brazil
- Capacity
- 120 MW
- Planned / design
- Verified
- Aug 26, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | Elea SPO2 São Bernardo do Campo | Elea SPO3 Tamboré |
|---|---|---|
| Record type | Site | Site |
| Status | Partially operational | Partially operational |
| Location | São Bernardo do Campo, SP, Brazil | Tamboré / Barueri, SP, Brazil |
| Headline capacity | 120 MW · Planned / design | No reviewed public value |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | DXC Technology | DXC Technology |
| Utility | No reviewed public value | No reviewed public value |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Aug 26, 2026 | Aug 26, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Partially operational · São Bernardo do Campo, SP, Brazil
Partially operational · Tamboré / Barueri, SP, Brazil
Save public profiles to a device watchlist, then create a separate view-only link.