Vantage MXP2 Milan Data Center Campus
PRJ-0856 · Site · Castelletto, Milan, Lombardy, Italy
Captured 2026-09-06T04:13:04.651Z · Record last updated 2026-08-28
SHA-256: 9611660cba45b1c1708ca8c579e6c771d32398ca366a589a7414d85d50d4e54d
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
Vantage MXP2 Milan Data Center Campus, also known as Vantage MXP2 Milan II, is a data center project in Castelletto, Milan, Lombardy, IT associated with Vantage Data Centers. Two-acre campus; two planned three-story data centers; more than 108,000 square feet; 32 MW critical IT capacity. State-of-the-art electrical systems, liquid-cooling readiness, low-water cooling design and diverse fiber connectivity. 32 MW is the two-building full-campus plan. The spring-2026 first-phase target is not treated as proof of operation.
Headline: 32 MW Planned critical IT
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Location Context · Vantage MXP2 Milan II | Castelletto, Milan | Lombardy | IT
actual · Vantage MXP2 Milan Data Center Campus (project)
Claim 62646 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage MXP2 Milan II profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/emea/milan-ii-italy
Lifecycle Status · Construction
actual · Vantage MXP2 Milan Data Center Campus (project)
Claim 62647 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage MXP2 Milan II profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/emea/milan-ii-italy
Reported Capacity · 32 MW
design · Vantage MXP2 Milan Data Center Campus (project)
Claim 62648 · Review: Approved · Claim date: Not published
Headline treatment: Selected headline
- Vantage Data Centers Vantage MXP2 Milan II profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/emea/milan-ii-italy
Capacity Basis · Vantage Data Centers publishes 32 MW of critical IT capacity for this record boundary.
actual · Vantage MXP2 Milan Data Center Campus (project)
Claim 62649 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage MXP2 Milan II profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/emea/milan-ii-italy
Location Context · Vantage MXP2 Milan II | Castelletto, Milan | Lombardy | IT
actual · Vantage MXP2 Milan Data Center Campus (project)
Claim 97398 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage MXP2 Milan II profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/emea/milan-ii-italy
Lifecycle Status · Construction
actual · Vantage MXP2 Milan Data Center Campus (project)
Claim 97399 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage MXP2 Milan II profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/emea/milan-ii-italy
Reported Capacity · 32 MW
Planned / design or future potential · Vantage MXP2 Milan Data Center Campus (project)
Claim 97400 · Review: Approved · Claim date: Not published
Headline treatment: Separate claim, not added to the headline
- Vantage Data Centers Vantage MXP2 Milan II profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/emea/milan-ii-italy
Capacity Basis · 32 MW is the two building full campus plan. The spring-2026 first phase target is not treated as proof of operation.
Planned / design or future potential · Vantage MXP2 Milan Data Center Campus (project)
Claim 97401 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage MXP2 Milan II profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/emea/milan-ii-italy
Site Area · 2 acres
actual · Vantage MXP2 Milan Data Center Campus (project)
Claim 97402 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage MXP2 Milan II profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/emea/milan-ii-italy
Building Count · 2 data centers
design · Vantage MXP2 Milan Data Center Campus (project)
Claim 97403 · Review: Approved · Claim date: Not published
- Vantage announces MXP2 investment and schedule
Vantage Data Centers · Document date: 2025-10-15 · Primary
https://vantage-dc.com/news/vantage-data-centers-expands-european-footprint-with-second-italian-campus/
Announced Investment · More than €350 million
transaction scope · Vantage MXP2 Milan Data Center Campus (project)
Claim 97405 · Review: Approved · Claim date: Not published
- Vantage announces MXP2 investment and schedule
Vantage Data Centers · Document date: 2025-10-15 · Primary
https://vantage-dc.com/news/vantage-data-centers-expands-european-footprint-with-second-italian-campus/
Medium Voltage Substations · 2 substations
design · Vantage MXP2 Milan Data Center Campus (project)
Claim 97407 · Review: Approved · Claim date: Not published
- Vantage announces MXP2 investment and schedule
Vantage Data Centers · Document date: 2025-10-15 · Primary
https://vantage-dc.com/news/vantage-data-centers-expands-european-footprint-with-second-italian-campus/
Counterparties and capital
Duereti · Utility Provider · CMP-1609
Terna · Utility Provider · CMP-0105
Vantage Data Centers · Developer · CMP-0109
€350,000,000 · 2025-10-15
Operator described investment as more than EUR 350 million; recorded as the disclosed floor, not a financing close.
Vantage Data Centers (Borrower)
Financing record 193; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.