Cartis diligence evidence schedule
US Signal MN01 Minneapolis Data Center
PRJ-1261 · Site · Eden Prairie, Minnesota, United States
Captured 2026-09-10T05:50:36.576Z · Record last updated 2026-09-10
SHA-256: 8303a9f838d42dc2a7cea8c0bc8d0efc111f19fc2fc6f92ca3782cde0bdc0244
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
Headline: 0.5 MW Planned critical IT
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Reported Capacity · 0.523 MW operating critical IT load
actual · US Signal MN01 Minneapolis Data Center (project)
Claim 157784 · Review: Approved · Claim date: 2026-09-04T00:00:00+00:00
Headline treatment: Selected headline
- MN01 Minneapolis data center
US Signal · Document date: 2026-09-04 · Primary
https://ussignal.com/data-centers/mn01-minneapolis/ - US Signal’s OneNeck acquisition expands nationwide footprint
Lightwave Online · Document date: 2024-06-03 · Corroborating
https://www.lightwaveonline.com/home/article/55055663/us-signals-oneneck-acquisition-expands-nationwide-data-center-footprint-it-network
Counterparties and capital
US Signal · Operator · CMP-1691
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.