Skip to content
← Return to profile

Cartis diligence evidence schedule

US Signal IA01 Des Moines Data Center

PRJ-1247 · Site · Waukee, Iowa, United States

Captured 2026-09-10T05:50:38.044Z · Record last updated 2026-09-10

SHA-256: 4179ff8b97a03192ea1cb53dc3c9b548f23586f872b09c138aca4e4e37d5a5de

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

Headline: 0.2 MW Planned critical IT

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Reported Capacity · 0.194 MW operating critical IT load

actual · US Signal IA01 Des Moines Data Center (project)

Claim 157131 · Review: Approved · Claim date: 2026-09-04T00:00:00+00:00

Headline treatment: Selected headline

  1. IA01 Des Moines data center

    US Signal · Document date: 2026-09-04 · Primary

    https://ussignal.com/data-centers/ia01-des-moines/
  2. US Signal’s OneNeck acquisition expands nationwide footprint

    Lightwave Online · Document date: 2024-06-03 · Corroborating

    https://www.lightwaveonline.com/home/article/55055663/us-signals-oneneck-acquisition-expands-nationwide-data-center-footprint-it-network

Counterparties and capital

US Signal · Operator · CMP-1691

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.