SUNeVision MEGA IDC

Tseung Kwan O, Hong Kong SAR ChinaPartially operational
Evidence
Planned critical IT
180 MW
Updated
Oct 29, 2026

SUNeVision MEGA IDC in Tseung Kwan O has a conservative 180 MW full-build IT design, not operating capacity. Phase One launched in 2024 with 50 MW. The 2025/26 report forecasts occupancy rising from about 30% toward or above 70% as customer implementation proceeds, not achieved occupancy. Combined remaining phases target 2028 readiness, superseding the earlier 2026/27 schedule. MEGA Plus and TKO Connect are network links, not additional campus buildings. Current energized load and project-specific debt allocation remain unverified; SUNeVision’s group-wide expansion must not be assigned to this site.

Capacity

Target IT capacity MW

Planned / design or future potential

180 MW

Source

Historical first phase capacity MW

Planned / design or future potential

50 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Milestones (3)
First phase launched in the first half of 2024 with 50 MW; year precision avoids inventing an exact launch date

2024 · Recorded actual event

Completed · Announced

Sources (1)
FY2025 reporting described phase-two construction and a 2026/27 target, superseded by the FY2026 remaining-phases plan

2025 · Recorded actual event

Completed · Announced

Sources (1)
FY2026 annual report published: remaining phases integrated with target ready-for-service in 2028, not achieved completion

Sep 22, 2026 · Recorded actual event

Completed · Announced

Sources (1)

Participants

SUNeVision

Developer · Operator

Sources by role
Developer / Operator (1)

Site & development

Site location

Reported rounded

297 Wan Po Road, Tseung Kwan O, New Territories, Hong Kong.

Source

Land and site control context

Reported rounded

Secure land tenure on land approved for data centre use, without neighbouring industrial estate subletting restrictions. Legal title holder and lease term not independently checked.

Source

Reviewed sun phase1 area context

Source report

SUNeVision’s 2025/26 annual report describes MEGA IDC Phase One as approximately 500,000 square feet of gross floor area and 50 MW of power capacity. This is a dated operator specification, not measured occupied load; the report’s group wide 150-to-280 MW expansion must not be assigned to this campus.

Source

Reviewed sun phase2 area context

Source report

In the 2025/26 report, SUNeVision plans to combine the formerly staged Phase 2a and Phase 2b into one development, targeting readiness in 2028 and approximately 700,000 square feet of data centre space. This is a development forecast, not completed delivery.

Source

Additional project facts

Reviewed sun occupancy forecast context

Source report

The 2025/26 report expects a major customer commitment to raise MEGA IDC Phase One occupancy from approximately 30% to around 70% upon full implementation. Its Chairman describes move in as in progress and expects occupancy above 70%. These are prospective implementation statements, not achieved 70% occupancy or occupied electrical load.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Reported context

Full build designed for 180 MW IT. Utility feed voltage, contracted supply and current energized total not verified.

Cooling system

Reported context

2024/25 ESG report identifies MEGA IDC chiller COP above 6. Precise cooling topology and redundancy are not established from reviewed material.

Fiber

Reported context

Linked to MEGA-i through adjacent MEGA Plus via TKO Connect subsea cable. Networked MEGA Campus is not one physical project.

Other · Documented

SUNeVision MEGA IDC

Sources (1)