SUNeVision MEGA IDC
- Planned critical IT
- 180 MW
- Updated
- Oct 29, 2026
SUNeVision MEGA IDC in Tseung Kwan O has a conservative 180 MW full-build IT design, not operating capacity. Phase One launched in 2024 with 50 MW. The 2025/26 report forecasts occupancy rising from about 30% toward or above 70% as customer implementation proceeds, not achieved occupancy. Combined remaining phases target 2028 readiness, superseding the earlier 2026/27 schedule. MEGA Plus and TKO Connect are network links, not additional campus buildings. Current energized load and project-specific debt allocation remain unverified; SUNeVision’s group-wide expansion must not be assigned to this site.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Milestones (3)
2024 · Recorded actual event
Completed · Announced
Sources (1)
- Interim Results Announcement for the six months ended 31 December 2025 · Feb 25, 2026 · Primary
2025 · Recorded actual event
Completed · Announced
Sources (1)
Sep 22, 2026 · Recorded actual event
Completed · Announced
Sources (1)
- SUNeVision Holdings Ltd. Annual Report 2025/26 · Sep 22, 2026 · Primary
Participants
Developer · Operator
Sources by role
Developer / Operator (1)
- SUNeVision Holdings Ltd. Annual Report 2025/26 · Sep 22, 2026 · Primary
Site & development
Land and site control context
Reported roundedSecure land tenure on land approved for data centre use, without neighbouring industrial estate subletting restrictions. Legal title holder and lease term not independently checked.
SourceReviewed sun phase1 area context
Source reportSUNeVision’s 2025/26 annual report describes MEGA IDC Phase One as approximately 500,000 square feet of gross floor area and 50 MW of power capacity. This is a dated operator specification, not measured occupied load; the report’s group wide 150-to-280 MW expansion must not be assigned to this campus.
SourceReviewed sun phase2 area context
Source reportIn the 2025/26 report, SUNeVision plans to combine the formerly staged Phase 2a and Phase 2b into one development, targeting readiness in 2028 and approximately 700,000 square feet of data centre space. This is a development forecast, not completed delivery.
SourceAdditional project facts
Reviewed sun occupancy forecast context
Source reportThe 2025/26 report expects a major customer commitment to raise MEGA IDC Phase One occupancy from approximately 30% to around 70% upon full implementation. Its Chairman describes move in as in progress and expects occupancy above 70%. These are prospective implementation statements, not achieved 70% occupancy or occupied electrical load.
SourceInfrastructure & permits
Technical details (3)
Reported context
Full build designed for 180 MW IT. Utility feed voltage, contracted supply and current energized total not verified.
Reported context
2024/25 ESG report identifies MEGA IDC chiller COP above 6. Precise cooling topology and redundancy are not established from reviewed material.
Reported context
Linked to MEGA-i through adjacent MEGA Plus via TKO Connect subsea cable. Networked MEGA Campus is not one physical project.
Project map
Other · Documented
SUNeVision MEGA IDC
Sources (1)
- Interim Results Announcement for the six months ended 31 December 2025 · Feb 25, 2026 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.