STTGDC Tokyo Campus TYO1 and TYO2
- Planned critical IT
- 70.8 MW
- Updated
- Oct 29, 2026
STT GDC’s Tokyo campus comprises TYO1 and TYO2 in Goodman Business Park, Inzai. Its 70.8 MW combined planned IT capacity is not all operating: TYO1 launched in June 2025, while TYO2 targets late-2027 operation. The October 2026 JPY93 billion green loan supports fit-out and subsequent operation of both buildings, not proof of drawn funding. TYO1 has dual 66 kV feeds and closed-loop cooling design. TYO2’s future liquid-cooling provision and TIA-942-C Design and LEED Gold targets do not establish installed systems or achieved certifications. Occupied IT load and lease-title details remain unverified.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Milestones (3)
Jun 25, 2025 · Recorded actual event
Completed · Announced
Sources (1)
- ST Telemedia Global Data Centres Launches STT Tokyo 1 · Jun 25, 2025 · Primary
Aug 21, 2026 · Recorded actual event
Completed · Announced
Sources (1)
- STT Tokyo 1 Achieves LEED® Gold Certification · Aug 21, 2026 · Primary
Oct 27, 2026 · Recorded actual event
Completed · Announced
Sources (1)
- STTGDC Secures JPY93 Billion Green Loan to Support Expansion of Tokyo Data Centre Campus · Oct 27, 2026 · Primary
Participants
Developer · Operator
Sources by role
Developer / Operator (1)
- STTGDC Secures JPY93 Billion Green Loan to Support Expansion of Tokyo Data Centre Campus · Oct 27, 2026 · Primary
Developer / Operator (1)
- STT Tokyo 1 Achieves LEED® Gold Certification · Aug 21, 2026 · Corroborating
Capital & incentives
Financing records
Debt financing
¥93,000,000,000Oct 27, 2026
JPY93 billion green loan announced October 27, 2026 for TYO1/TYO2 fit-out and subsequent operation. Not capex or operating capacity. Standard Chartered was Lead Coordinator and, with Societe Generale, Green Loan Coordinator. Mizuho Bank, OCBC and UOB supported the financing alongside them; their exact contractual roles are not specified and are mapped as other, not inferred lenders. Societe Generale involvement is retained here, while its structured link is held because two canonical identities exist.
Parties & sources
Mizuho Bank (Other) · OCBC (Other) · Standard Chartered Bank (Arranger) · UOB (Other)
Sources (1)
Site & development
Site location
Reported roundedGoodman Business Park, Inzai City, Chiba Prefecture, Japan. Exact building street number not established.
SourceLand and site control context
Reported roundedCampus occupies two buildings within Goodman Business Park. Lease title and term not verified; Goodman estate ownership is not operator identity.
SourceAdditional project facts
Reviewed stt tyo2 targets context
Source reportThe October 27, 2026 announcement describes TYO2 as being designed for high density AI workloads, with provision for future liquid cooling, and targeting TIA-942-C Design Certification and LEED Gold. Neither certification target nor future liquid cooling provision establishes an achieved certificate or installed system.
SourceInfrastructure & permits
Technical details (3)
Reported context
TYO1 uses dual 66 kV feeds and on-site substation. Behind-meter solar serves ancillary uses; do not describe it as powering the entire campus.
Reported context
TYO1 closed-loop cooling designed for no ongoing water consumption in normal operation; annualized design PUE below 1.25. TYO2 provides for future liquid cooling, not installed proof.
Reported context
Carrier-neutral colocation marketed; exact carrier routes, fibre entries and service contracts not confirmed in reviewed releases.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.