STACK STO01 Upplands Väsby Data Center Campus
- Planned critical IT
- 18 MW
- Updated
- Oct 28, 2026
STO01 in Upplands Väsby is now operated by Vaultica after the Apollo-backed STACK colocation carve-out. Vaultica currently reports 12 MW and 5,600 square metres; the legacy STACK record reported 18 MW. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
STO01 in Upplands Väsby is now operated by Vaultica after the Apollo-backed STACK colocation carve-out. Vaultica currently reports 12 MW and 5,600 square metres; the legacy STACK record reported 18 MW. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Milestones (1)
Aug 29, 2026 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer · Operator
Sources by role
Developer (1)
- STACK Infrastructure STACK STO01 profile · Aug 28, 2026 · Primary
Operator (1)
- Apollo acquisition of STACK European colocation business · Apr 29, 2025 · Primary
Site & development
Additional project facts
Capacity basis
ActualSTACK Infrastructure publishes 18 MW of critical IT capacity for this record boundary.
SourceCapacity basis
ActualVaultica currently reports 12 MW for STO01; the legacy STACK profile reported an 18 MW building boundary. Cartis uses the current operator figure and preserves the historical 18 MW as superseded context.
SourceCapacity basis
ActualVaultica currently reports 12 MW for STO01; the legacy STACK profile reported an 18 MW building boundary. Cartis uses the current operator figure and preserves the historical 18 MW as superseded context.
SourceInfrastructure & permits
Technical details (3)
Operational
12 MW
Vaultica currently reports 12 MW for STO01; the legacy STACK profile reported an 18 MW building boundary. Cartis uses the current operator figure and preserves the historical 18 MW as superseded context.
Operational
Renewable-power communications campus with expansion-ready connectivity north of Stockholm.
Operational
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.