STACK OSL04 Holtskogen Data Center Campus

Holtskogen, Østfold, NorwayPartially operational
Capacity
18 MW
Planned critical IT
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK OSL04 Holtskogen Data Center Campus

STACK OSL04 is the Holtskogen campus east of Oslo, independently registered at 18 MW across multiple facilities and marketed with certified renewable supply. It remains separate from the Oslo colocation assets rebranded as Vaultica, and the profile does not infer that the carve-out changed OSL04 ownership. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load18 MWDesign · STACK OSL04 Holtskogen Data Center Campus
Design18 MWDesign · STACK OSL04 Holtskogen Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

STACK OSL04 is the Holtskogen campus east of Oslo, independently registered at 18 MW across multiple facilities and marketed with certified renewable supply. It remains separate from the Oslo colocation assets rebranded as Vaultica, and the profile does not infer that the carve-out changed OSL04 ownership. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridOperational

18 MW

18 MW is the operator-published facility design or maximum power boundary; it is not measured tenant utilization.

FiberOperational

Renewable-power campus with high-efficiency Nordic cooling, snow-melt and rainwater-reuse systems.

Cooling SystemOperational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

17 facts
Location Context
STACK OSL04 | Holtskogen | Østfold | NO
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
18 MW
Design
Capacity Basis
STACK Infrastructure publishes 18 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK OSL04 | Holtskogen | Østfold | NO
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
18 MW
Design
Capacity Basis
18 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.
Actual
Operator Or Developer
STACK Infrastructure
Actual
Project Location
Holtskogen, Østfold, NO
Actual
Current Lifecycle
Operating or in phased operation
Actual
Capacity Classification
Design
Actual
Capacity Basis
18 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Campus Buildings
3 facilities
Design
Renewable Energy Claim
100 percent
Actual