STACK OSL03 Fetsund Data Center Campus
- Headline capacity
- Not established in published records
- Updated
- Oct 28, 2026
OSL03 is the four-building Fetsund campus historically totaling 22 MW. Current records still map the campus under STACK, while transaction evidence indicates at least one enterprise-colocation component entered the Apollo carve-out. The named capacity or identity conflict remains unresolved.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
OSL03 is the four-building Fetsund campus historically totaling 22 MW. Current records still map the campus under STACK, while transaction evidence indicates at least one enterprise-colocation component entered the Apollo carve-out. The available public sources do not establish a single project-scoped capacity figure. The named capacity or identity conflict remains unresolved.
Milestones (1)
Aug 29, 2026 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- STACK Infrastructure STACK OSL03 profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
ActualSTACK Infrastructure publishes 22 MW of critical IT capacity for this record boundary.
SourceCapacity basis
ActualThe legacy campus total is 22 MW across four buildings, but public M&A evidence indicates at least a colocation component entered the Apollo/Vaultica carve out. The campus/operator boundary is unresolved and the headline is withheld.
SourceInfrastructure & permits
Technical details (3)
Operational
The legacy campus total is 22 MW across four buildings, but public M&A evidence indicates at least a colocation component entered the Apollo/Vaultica carve-out. The campus/operator boundary is unresolved and the headline is withheld.
Operational
Renewable hydroelectric power, embedded fiber and core infrastructure, and Nordic-climate air-to-air cooling.
Operational
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.