Data center siteSite record

STACK OSL03 Fetsund Data Center Campus

Fetsund, Akershus, NorwayPartially operational
Capacity
No public figure
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK OSL03 Fetsund Data Center Campus

OSL03 is the four-building Fetsund campus historically totaling 22 MW. Current records still map the campus under STACK, while transaction evidence indicates at least one enterprise-colocation component entered the Apollo carve-out. The named capacity or identity conflict remains unresolved.

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

OSL03 is the four-building Fetsund campus historically totaling 22 MW. Current records still map the campus under STACK, while transaction evidence indicates at least one enterprise-colocation component entered the Apollo carve-out. The available public sources do not establish a single project-scoped capacity figure. The named capacity or identity conflict remains unresolved.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridOperational

The legacy campus total is 22 MW across four buildings, but public M&A evidence indicates at least a colocation component entered the Apollo/Vaultica carve-out. The campus/operator boundary is unresolved and the headline is withheld.

FiberOperational

Renewable hydroelectric power, embedded fiber and core infrastructure, and Nordic-climate air-to-air cooling.

Cooling SystemOperational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
STACK OSL03 | Fetsund | Akershus | NO
Actual
Lifecycle Status
Partially operational
Actual
Capacity Basis
STACK Infrastructure publishes 22 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK OSL03 | Fetsund | Akershus | NO
Actual
Lifecycle Status
Partially operational
Actual
Operator Or Developer
STACK Infrastructure
Actual
Project Location
Fetsund, Akershus, NO
Actual
Current Lifecycle
Operating or in phased operation
Actual
Capacity Classification
Design
Actual
Capacity Basis
The legacy campus total is 22 MW across four buildings, but public M&A evidence indicates at least a colocation component entered the Apollo/Vaultica carve out. The campus/operator boundary is unresolved and the headline is withheld.
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Campus Buildings
4
Design