STACK KIX01 Keihanna Data Center Campus

Keihanna, Kyoto Prefecture, JapanUnder construction
Evidence
Planned critical IT
80 MW
Updated
Oct 28, 2026

STACK KIX01 Keihanna Data Center Campus, also known as STACK KIX01, is a data center project in Keihanna, Kyoto Prefecture, JP developed and operated by STACK Infrastructure. 13.1-acre Osaka-region campus planned for three buildings and 80 MW of total IT capacity. Dual 77 kV high-voltage lines, redundant generation and UPS systems, scalable air-cooled chillers and diverse connectivity. STACK’s Japanese page reports 80 MW, the English project page reports 72 MW, and current APAC rollups report 78 MW. The cited identity or capacity sources conflict and do not establish a single project-scoped capacity figure.

Capacity

Reported capacity

Design

80 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryUnder construction

STACK’s Japanese page reports 80 MW, the English project page reports 72 MW, and current APAC rollups report 78 MW. The available public sources do not establish a single project-scoped capacity figure.

Participants

STACK Infrastructure

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

STACK KIX01 | Keihanna | Kyoto Prefecture | JP

Source

Location context

Actual

STACK KIX01 | Keihanna | Kyoto Prefecture | JP

Source

Site area

Design

5.3 hectares

Source

Additional project facts

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

STACK Infrastructure publishes 80 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Construction

Source

Infrastructure & permits

Technical details (3)
Electric grid

Planned or represented

Dual 77 kV high-voltage lines, redundant generation and UPS systems, scalable air-cooled chillers and diverse connectivity.

Fiber

Planned or represented

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Electric grid

Planned or represented

77 kV

Dual special-high-voltage lines are specified; the public IT capacity remains held because current operator pages conflict.

Public-source research. Plans may change. See Evidence for sources and qualifications.