STACK ICN01 Incheon Data Center

Incheon, South KoreaPartially operational
Evidence
Planned critical IT
48 MW
Updated
Oct 28, 2026
Utility
KEPCO

STACK ICN01 Incheon Data Center, also known as STACK ICN01, is a data center project in Incheon, Incheon, KR developed and operated by STACK Infrastructure. Single-building 48 MW facility in Incheon, a western suburb of Seoul, developed with ESR. Secured KEPCO power, robust network connectivity and high-density-capable floor and cooling specifications. 48 MW is the planned IT-load boundary for the phased Bupyeong/ICN01 facility; the partner’s 80 MW figure is a wider utility envelope and is not substituted for IT capacity.

Capacity

Reported capacity

Design

48 MW

Source

Reported capacity

Planned / design or future potential

48 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

48 MW is the planned IT-load boundary for the phased Bupyeong/ICN01 facility; the partner’s 80 MW figure is a wider utility envelope and is not substituted for IT capacity.

Milestones (2)
STACK and ESR announced 48 MW Incheon project

Sep 8, 2022 · Recorded actual event

Completed · Announced

Source not linked
Partner portfolio targeted first-phase readiness during 2025

2025 · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

ESR Group

Developer

Sources by role
Developer (1)
STACK Infrastructure

Developer

Sources by role
Developer (1)
Other participants (1)
KEPCO

Utility provider

Sources by role
Utility provider (1)

Site & development

Location context

Actual

STACK ICN01 | Incheon | Incheon | KR

Source

Location context

Actual

STACK ICN01 | Incheon | Incheon | KR

Source

Single building

Actual

Bupyeong KR1

Source

Additional project facts

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

STACK Infrastructure publishes 48 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

48 MW is the planned IT-load boundary for the phased Bupyeong/ICN01 facility; the partner’s 80 MW figure is a wider utility envelope and is not substituted for IT capacity.

Source

Phase 1 target

Forecast

2025

Source

Phase 2 target

Forecast

2026

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

Secured KEPCO power, robust network connectivity and high-density-capable floor and cooling specifications.

Fiber

Energized

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Electric grid

Secured or contracted

80 MW gross

KEPCO/partner utility envelope; 48 MW is the separate IT-load design.

Public-source research. Plans may change. See Evidence for sources and qualifications.