STACK FRA01 Liederbach Data Center Campus, also known as STACK FRA01, is a data center project in Liederbach am Taunus, Hesse, DE developed and operated by STACK Infrastructure. 17-acre Frankfurt-area campus designed for 96 MW of critical capacity. Planned hyperscale facility in the Frankfurt connectivity market with resilient power and cooling systems. 96 MW is the operator-published future facility or full-build design boundary.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
96 MW is the operator-published future facility or full-build design boundary. It is not operating IT load.
Participants
Developer
Sources by role
Developer (1)
- STACK Infrastructure STACK FRA01 profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Infrastructure & permits
Technical details (2)
Planned or represented
Planned hyperscale facility in the Frankfurt connectivity market with resilient power and cooling systems.
Planned or represented
STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.