Soluna–Metrobloks Project Kati 2 AI Data Center Campus

Texas, United StatesPreconstruction
Evidence
Planned critical IT
100 MW
Updated
Oct 28, 2026

Soluna and Metrobloks formed a joint venture to develop Kati 2 in Willacy County. Phase I is planned for 100 MW of critical IT, with a second 250 MW phase creating a 350 MW full-build path. Soluna Holdings and Metrobloks is publicly identified in the project record for Willacy County, TX, US. The disclosed development record includes 100 MW planned Phase I critical IT; 250 MW Phase II; 350 MW potential full build. Power and infrastructure include multi-phase critical-IT campus planned around Soluna's renewable-compute model. The joint-venture agreement defines Phase I as a 100 MW critical IT development. Soluna disclosed an initial funded contribution and further land and operating commitments under the Kati 2 joint venture.

Capacity

Reported capacity

Design

100 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

Project-wide phase for Soluna–Metrobloks Project Kati 2 AI Data Center Campus; capacity remains classified as it load.

Milestones (2)
Kati 2 project status and capacity disclosed

Aug 14, 2026 · Recorded actual event

Completed · Announced

Source not linked
Joint venture formed and site contributions underway

Date not disclosed · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

Metrobloks

Developer

Sources by role
Developer (1)
Soluna Holdings

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Project Kati 2 | Willacy County | Texas

Source

Development scale

Actual

100 MW planned Phase I critical IT

Source

Development milestone

Actual

250 MW Phase II

Source

Technical specifications

Power arrangement

Actual

350 MW potential full build.

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

The joint venture agreement defines Phase I as a 100 MW critical IT development.

Source

Boundary context

Actual

Project Kati 2 | Willacy County | Texas

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

100 MW

The joint-venture agreement defines Phase I as a 100 MW critical IT development.

Site facility

Planned or represented

Multi-phase critical-IT campus planned around Soluna's renewable-compute model.

Public-source research. Plans may change. See Evidence for sources and qualifications.