Segra Raleigh Data Center
- Planned / design
- 2.5 MW
- Updated
- Oct 28, 2026
Segra Raleigh Data Center is an operating Segra data center facility in Raleigh, North Carolina. Segra's facility at 2100 Garner Station Boulevard; 2.5 MW is facility power capacity, not achieved customer IT. The retrofit records facility power capacity: 2.5 MW; building area: 50,000 sq ft. Utility service, UPS, standby generation, cooling, facility power and IT load are kept in their source-defined scopes rather than collapsed into one capacity number. Where reliable public evidence for ownership, project financing, permitting, tenants or water arrangements was not established, Cartis records the research gap explicitly instead of inferring a fact.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Operating data center facility.
Participants
Operator
Sources by role
Operator (1)
- Segra Raleigh data-center tour · Oct 8, 2025 · Primary
Operator (1)
- Cox closes Segra purchase · Oct 6, 2021 · Corroborating
Site & development
Additional project facts
Infrastructure & permits
Technical details (4)
Operational
2.5 MW
Facility power capacity; separate from IT load.
Operational
Redundant generator architecture reported; no generator MW inferred.
Operational
Redundant cooling architecture reported; no tonnage captured.
Operational
Carrier-neutral connectivity and diverse paths.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (2)
Operating · Raleigh, North Carolina, United States
Same locality: Raleigh
Compare in a collectionOperating · Kannapolis, North Carolina, United States
Shared participant: Segra · Same market: North Carolina, United States
Compare in a collection