RCM Hill Data Center

Hillsboro, Texas, United StatesProposed
Evidence
Planned / design
1,235 MW
Updated
Oct 28, 2026

RCM Hill’s Project Aquila is a proposed data center campus on more than 800 acres in unincorporated Hill County, Texas. Court and local reporting describe an approximately 1.235 GW plan, more than $80 million of land contracts and claimed ERCOT planning approvals; the project also became the subject of federal litigation over the county’s data center moratorium and review process. The 1.235 GW figure is a proposed design load, not operating capacity. Litigation, land closing, county review, water, permits, financing and construction timing remain unresolved.

Capacity

Reported capacity

Planned / design or future potential

1,235 MW

Source

Reported capacity

Planned / design or future potential

1,235 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Land, utility and contested local reviewAnnounced or preconstruction

RCM Hill’s Project Aquila is a proposed data center campus on more than 800 acres in unincorporated Hill County, Texas. Court and local reporting describe an approximately 1.235 GW plan, more than $80 million of land contracts and claimed ERCOT planning approvals; the project also became the subject of federal litigation over the county’s data center moratorium and review process. The 1.235 GW figure is a proposed design load, not operating capacity. Litigation, land closing, county review, water, permits, financing and construction timing remain unresolved.

Milestones (2)
RCM Hill filed federal lawsuit

May 27, 2026 · Recorded actual event

Completed · Status changed

Source not linked
County replaced moratorium with review requirements

Jun 5, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

RCM Hill LLC

Developer

Sources by role
Developer (1)

Capital & incentives

Capital claims

Land contract value

Reported rounded

$80,000,000

Source

Site & development

Location context

Actual

RCM Hill Data Center | Hillsboro | Texas | US

Source

Location context

Actual

RCM Hill Data Center | Hillsboro | Texas | US

Source

Site area

Reported rounded

800 acres

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

1,235 MW future full build site capacity; not measured operating IT load.

Source

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

1,235 MW is the proposed Project Aquila design load described in litigation and local reporting.

Source

Project alias

Actual

Project Aquila

Source

Litigation status

Actual

Federal challenge to county moratorium/review process

Source

Infrastructure & permits

Technical details (1)
Electric grid

Planned or represented

1,235 MW

Proposed design load with claimed ERCOT planning progress; not operating capacity.

Other · Under review

Project Aquila

Hill County, Texas

Jun 5, 2026

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.