Raxio ET1 Addis Ababa

PRJ-0045 · Site · ICT Park, outskirts of Addis Ababa, AA, Ethiopia

Captured 2026-09-06T04:12:54.041Z · Record last updated 2026-08-22

SHA-256: ed48b748a0586ef13f0a0127357a480108c6fac397f3ccf0c43fa282b59d55b5

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

Raxio ET1 is an operating carrier-neutral Tier III facility in Addis Ababa's ICT Park. It is designed for up to 3 MW of IT power and 800 racks and received Tier III Constructed Facility certification in 2024.

Headline:

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Project Status · Operating

actual · Raxio ET1 Addis Ababa (project)

Claim 6032 · Review: Approved · Claim date: 2023-11-21T00:00:00+00:00

  1. Raxio Group’s Mozambique and Ethiopia Data Centres Achieve Uptime Institute Tier III Facility Certification

    Raxio Group · Document date: 2024-12-17 · Corroborating

    https://www.raxiogroup.com/raxio-groups-mozambique-and-ethiopia-data-centres-achieve-uptime-institute-tier-iii-facility-certification/
  2. Raxio Launches New Flagship Data Centre in Ethiopia

    Raxio Group · Document date: 2023-11-21 · Corroborating

    https://www.raxiogroup.com/raxio-continues-support-of-africas-digital-transformation-and-digital-economy-with-launch-of-new-flagship-data-centre-in-ethiopia/
  3. Ethiopia — Raxio ET1

    Raxio Group · Document date: Not published · Primary

    https://www.raxiogroup.com/data-centres/ethiopia/

Designed It Capacity · 3 MW

Planned / design or future potential · ET1 full facility design (phase)

Claim 6033 · Review: Approved · Claim date: 2023-11-21T00:00:00+00:00

Headline treatment: Phase scope; not a whole-site figure

  1. Raxio Launches New Flagship Data Centre in Ethiopia

    Raxio Group · Document date: 2023-11-21 · Corroborating

    https://www.raxiogroup.com/raxio-continues-support-of-africas-digital-transformation-and-digital-economy-with-launch-of-new-flagship-data-centre-in-ethiopia/
  2. Raxio ET1 Receives Tier III Certification from Uptime Institute

    Raxio Group · Document date: 2022-11-22 · Corroborating

    https://www.raxiogroup.com/raxio-data-centre-in-ethiopia-et1-receives-tier-iii-certification-from-uptime-institute/
  3. Ethiopia — Raxio ET1

    Raxio Group · Document date: Not published · Primary

    https://www.raxiogroup.com/data-centres/ethiopia/

Commissioned Capacity · 0.5 MW

actual · Initial commissioned slice (phase)

Claim 6034 · Review: Approved · Claim date: Not published

Headline treatment: Phase scope; not a whole-site figure

  1. IFC Environmental & Social Review Summary — Raxio DC (Project 48537)

    International Finance Corporation · Document date: 2024-04-17 · Primary

    https://disclosures.ifc.org/project-detail/ESRS/48537/raxio-dc

Rack Capacity · 800 racks

design · Raxio ET1 Addis Ababa (project)

Claim 6035 · Review: Approved · Claim date: 2023-11-21T00:00:00+00:00

  1. Raxio Launches New Flagship Data Centre in Ethiopia

    Raxio Group · Document date: 2023-11-21 · Corroborating

    https://www.raxiogroup.com/raxio-continues-support-of-africas-digital-transformation-and-digital-economy-with-launch-of-new-flagship-data-centre-in-ethiopia/
  2. Ethiopia — Raxio ET1

    Raxio Group · Document date: Not published · Primary

    https://www.raxiogroup.com/data-centres/ethiopia/

White Space · 2,000 sq m

actual · Raxio ET1 Addis Ababa (project)

Claim 6036 · Review: Approved · Claim date: Not published

  1. Ethiopia — Raxio ET1

    Raxio Group · Document date: Not published · Primary

    https://www.raxiogroup.com/data-centres/ethiopia/

Tenure · Long term leasehold

actual · Raxio ET1 Addis Ababa (project)

Claim 6037 · Review: Approved · Claim date: Not published

  1. Ethiopia — Raxio ET1

    Raxio Group · Document date: Not published · Primary

    https://www.raxiogroup.com/data-centres/ethiopia/

Utility Supply · 33 KV N+N direct feed from nearest substation

design · Raxio ET1 Addis Ababa (project)

Claim 6038 · Review: Approved · Claim date: Not published

  1. Ethiopia — Raxio ET1

    Raxio Group · Document date: Not published · Primary

    https://www.raxiogroup.com/data-centres/ethiopia/

Backup Fuel Autonomy · 48 hours

design · Raxio ET1 Addis Ababa (project)

Claim 6039 · Review: Approved · Claim date: Not published

  1. Ethiopia — Raxio ET1

    Raxio Group · Document date: Not published · Primary

    https://www.raxiogroup.com/data-centres/ethiopia/

Telecom Presence · Ethio Telecom PoP along major fibre routes

actual · Raxio ET1 Addis Ababa (project)

Claim 6040 · Review: Approved · Claim date: Not published

  1. Ethiopia — Raxio ET1

    Raxio Group · Document date: Not published · Primary

    https://www.raxiogroup.com/data-centres/ethiopia/

Tier Design Certification · Tier III

design · ET1 full facility design (phase)

Claim 6041 · Review: Approved · Claim date: 2022-11-22T00:00:00+00:00

  1. Raxio ET1 Receives Tier III Certification from Uptime Institute

    Raxio Group · Document date: 2022-11-22 · Primary

    https://www.raxiogroup.com/raxio-data-centre-in-ethiopia-et1-receives-tier-iii-certification-from-uptime-institute/

Tier Constructed Facility Certification · Tier III TCCF

actual · ET1 full facility design (phase)

Claim 6042 · Review: Approved · Claim date: 2024-12-17T00:00:00+00:00

  1. Raxio Group’s Mozambique and Ethiopia Data Centres Achieve Uptime Institute Tier III Facility Certification

    Raxio Group · Document date: 2024-12-17 · Primary

    https://www.raxiogroup.com/raxio-groups-mozambique-and-ethiopia-data-centres-achieve-uptime-institute-tier-iii-facility-certification/

Carrier Model · Carrier neutral

actual · Raxio ET1 Addis Ababa (project)

Claim 6043 · Review: Approved · Claim date: 2023-11-21T00:00:00+00:00

  1. Raxio Launches New Flagship Data Centre in Ethiopia

    Raxio Group · Document date: 2023-11-21 · Corroborating

    https://www.raxiogroup.com/raxio-continues-support-of-africas-digital-transformation-and-digital-economy-with-launch-of-new-flagship-data-centre-in-ethiopia/
  2. Ethiopia — Raxio ET1

    Raxio Group · Document date: Not published · Primary

    https://www.raxiogroup.com/data-centres/ethiopia/

Operator Launch Date · 2023-11-21

actual · Raxio ET1 Addis Ababa (project)

Claim 6045 · Review: Approved · Claim date: 2023-11-21T00:00:00+00:00

  1. Raxio Launches New Flagship Data Centre in Ethiopia

    Raxio Group · Document date: 2023-11-21 · Primary

    https://www.raxiogroup.com/raxio-continues-support-of-africas-digital-transformation-and-digital-economy-with-launch-of-new-flagship-data-centre-in-ethiopia/

Counterparties and capital

Ethio Telecom · Supplier · CMP-0220

International Finance Corporation · Lender · CMP-0219

Meridiam · Investor · CMP-0218

Raxio Data Centre PLC · Owner · CMP-0216

Raxio Group · Operator · CMP-0215

Roha Group · Investor · CMP-0217

Uptime Institute · Contractor · CMP-0221

Equity Investment

$48,000,000 · 2021-03-29

Meridiam platform investment alongside Roha; zero amount allocated to ET1.

Meridiam (Sponsor) · Roha Group (Sponsor)

Financing record 36; claim-specific source links appear in the exhibit sources where published.

Debt Financing

$100,000,000 · 2025-03-25

IFC loan to multi-country Raxio portfolio; zero amount allocated to ET1.

International Finance Corporation (Lender) · Raxio Group (Borrower)

Financing record 37; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.