Skip to content

Raxio DRC1 Kinshasa

Limete, Kinshasa, KN, Congo - KinshasaOperating
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

Raxio DRC1 Kinshasa is a single two-storey physical facility. The current 1,056 sqm white space and opening release's 1,542 sqm total building area describe different area scopes.

Capacity

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

DRC1 operationsOperational

1 building

Current facility scope.

Milestones (1)
Raxio Kinshasa broke ground

Aug 2022 · Recorded actual event

Completed · Construction started

Source not linked

Participants

Raxio Group

Operator

Sources by role
Other participants (2)
Uptime Institute

Contractor

Sources by role

Additional project facts

Project identity

Source report

Raxio DRC1 Kinshasa

Source

Infrastructure & permits

Technical details (4)
Electric grid

Operational

33 kV

Direct feed from nearest substation; utility identity not disclosed.

Fuel storage

Operational

48 hours

Full-load onsite fuel endurance.

Cooling system

Operational

2 MW

Installed cooling with N+1 indirect-adiabatic design; distinct from 1.5 MW IT.

Fiber

Operational

9 providers

Two MMRs and two diverse intake points.

Public-source research. Plans may change. See Evidence for sources and qualifications.