Project Patriot

Granbury, Texas, United StatesProposed
Capacity
1,200 MW
Planned / design
Lead participant
Bilateral Energy
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Project Patriot

Project Patriot is Bilateral Energy’s proposed digital-infrastructure campus in Granbury, Texas. The concept covers roughly 2,000 acres and is designed around islanded onsite generation, privately funded infrastructure, and closed-loop water use; the City says no development application or approved site plan had been filed as of July 28, 2026.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential1,200 MWDesign · Project Patriot

Development

1 phases · 2 milestones
Concept planning and environmental engineeringAnnounced Or Preconstruction

Project Patriot is Bilateral Energy’s proposed digital-infrastructure campus in Granbury, Texas. The concept covers roughly 2,000 acres and is designed around islanded onsite generation, privately funded infrastructure, and closed-loop water use; the City says no development application or approved site plan had been filed as of July 28, 2026.

Jun 23, 2026
Concept plan dated
Completed
Jul 28, 2026
City reported no filed development application or approved site plan
Completed

Infrastructure

Onsite GenerationPotential Or Planned

1,200 MW

Self-generation concept; capacity remains a proposed design envelope.

Cooling SystemPotential Or Planned

Closed-loop water system intended to operate outside municipal drinking-water supply.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Generation & storage: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
Project Patriot | Granbury | Texas | US
Actual
Lifecycle Status
Proposed
Actual
Reported Capacity
1,200 MW
Design
Capacity Basis
1,200 MW future full build site capacity; not measured operating IT load.
Actual
Site Area
2,000 acres
Actual
Power Configuration
Islanded onsite generation
Actual
Cooling System
Closed loop, low water design
Actual
Development Application Status
Not filed as of July 28, 2026
Actual