Project Horizon

Fort Stockton, Texas, United StatesDelayed
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

Project Horizon is Poolside’s proposed AI-compute campus near Fort Stockton, Texas, planned around behind-the-meter gas generation, backup grid service and closed-loop cooling that avoids municipal potable water. Earlier materials described a 2 GW full-build campus and CoreWeave as a 250 MW anchor, but later disclosures indicate that lease was terminated in 2026. Generation permits, financing, water sourcing and construction status remain open.

Capacity

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Delayed commercial and energy-plan revalidationChanged or cancelled

Project Horizon is Poolside’s proposed AI-compute campus near Fort Stockton, Texas, planned around behind-the-meter gas generation, backup grid service and closed-loop cooling that avoids municipal potable water. Earlier materials described a 2 GW full-build campus and CoreWeave as a 250 MW anchor, but later disclosures indicate that lease was terminated in 2026. The available public sources do not establish a single project-scoped capacity figure. Generation permits, financing, water sourcing and construction status remain open.

Participants

Poolside AI

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Project Horizon | Fort Stockton | Texas | US

Source

Location context

Actual

Project Horizon | Fort Stockton | Texas | US

Source

Site area

Actual

559 acres

Source

Technical specifications

Water design

Actual

Closed loop; no municipal potable water planned

Source

Additional project facts

Lifecycle status

Actual

Delayed

Source

Capacity basis

Actual

2,000 MW future full build site capacity; not measured operating IT load.

Source

Lifecycle status

Actual

Delayed

Source

Commercial status

Actual

Former anchor lease reported terminated in 2026

Source

Infrastructure & permits

Technical details (2)
Onsite generation

Planned or represented

2,000 MW

Behind-the-meter gas concept; not IT load.

Electric grid

Potential or planned

Grid service described as backup.

Public-source research. Plans may change. See Evidence for sources and qualifications.