Project Horizon
- Headline capacity
- Not established in published records
- Updated
- Oct 28, 2026
Project Horizon is Poolside’s proposed AI-compute campus near Fort Stockton, Texas, planned around behind-the-meter gas generation, backup grid service and closed-loop cooling that avoids municipal potable water. Earlier materials described a 2 GW full-build campus and CoreWeave as a 250 MW anchor, but later disclosures indicate that lease was terminated in 2026. Generation permits, financing, water sourcing and construction status remain open.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Project Horizon is Poolside’s proposed AI-compute campus near Fort Stockton, Texas, planned around behind-the-meter gas generation, backup grid service and closed-loop cooling that avoids municipal potable water. Earlier materials described a 2 GW full-build campus and CoreWeave as a 250 MW anchor, but later disclosures indicate that lease was terminated in 2026. The available public sources do not establish a single project-scoped capacity figure. Generation permits, financing, water sourcing and construction status remain open.
Participants
Developer
Sources by role
Developer (1)
- Project Horizon public-record research record · Aug 28, 2026 · Primary
Site & development
Technical specifications
Additional project facts
Infrastructure & permits
Technical details (2)
Planned or represented
2,000 MW
Behind-the-meter gas concept; not IT load.
Potential or planned
Grid service described as backup.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (1)
Preconstruction · Fort Stockton, Texas, United States
Same locality: Fort Stockton
Compare in a collection