Project Cardinal Data Center

Yorkville, Illinois, United StatesProposed
Capacity
No public figure
Lead participant
Pioneer Development
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Project Cardinal Data Center

Project Cardinal is Pioneer Development’s proposed data center campus in Yorkville, Illinois. City records cover roughly 1,037 acres, a planned-unit development and a campus concept with 14 buildings, including 11 large and three smaller facilities. The tracked 1.8 GW figure is not published as an approved operating or contracted capacity by the city, so Tertiary utility plans, transmission, water, sound controls, building permits, tenants and construction phases remain under review.

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 1 milestones
Approved master plan; utilities and building permits pendingAnnounced Or Preconstruction

Project Cardinal is Pioneer Development’s proposed data center campus in Yorkville, Illinois. City records cover roughly 1,037 acres, a planned-unit development and a campus concept with 14 buildings, including 11 large and three smaller facilities. The tracked 1.8 GW figure is not published as an approved operating or contracted capacity by the city, so the available public sources do not establish a single project-scoped capacity figure. Tertiary utility plans, transmission, water, sound controls, building permits, tenants and construction phases remain under review.

14 buildings

Nov 1, 2025
Planned-unit development approved
Completed

Infrastructure

Utility ServicePotential Or Planned

1,800 MW

Capacity estimate not verified in the city approval record.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

9 facts
Location Context
Project Cardinal Data Center | Yorkville | Illinois | US
Actual
Lifecycle Status
Proposed
Actual
Capacity Basis
1,800 MW future full build site capacity; not measured operating IT load.
Actual
Location Context
Project Cardinal Data Center | Yorkville | Illinois | US
Actual
Lifecycle Status
Proposed
Actual
Site Area
1,037 acres
Actual
Building Count
14
Actual
Large Buildings
11
Actual
Small Buildings
3