Prime Frankfurt FRA01 Data Center Campus

Main-Taunus-Kreis, Hesse, GermanyPreconstruction
Evidence
Planned critical IT
20 MW
Updated
Oct 28, 2026

Prime Frankfurt FRA01 Data Center Campus, also known as Prime Frankfurt FRA01, is a data center project in Main-Taunus-Kreis, HE, DE associated with Prime Data Centers. 2.8-acre site; one planned hyperscale facility; 15,000 square metres; 20 MW critical IT load. Frankfurt-region development with nearby substation, closed-loop air and liquid cooling and six carriers in proximity. 20 MW is the source-defined future IT or site design envelope. Disclosed investment or financing context is recorded with its transaction scope and is not treated as delivered project cost or proof of capacity.

Capacity

Reported capacity

Design

20 MW

Source

Reported capacity

Planned / design or future potential

20 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryAnnounced or preconstruction

20 MW is the source-defined future IT or site design envelope. It is not operating IT load.

Milestones (1)
No operating status inferred from development evidence

Aug 30, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

Prime Data Centers

Developer

Sources by role
Developer (1)

Capital & incentives

Financing records

Equity investment

Amount not disclosed

Oct 14, 2025

Platform-level funding context; no site-level amount is inferred.

Parties & sources

Prime Data Centers (Borrower)

Site & development

Location context

Actual

Prime Frankfurt FRA01 | Main-Taunus-Kreis | HE | DE

Source

Location context

Actual

Prime Frankfurt FRA01 | Main-Taunus-Kreis | HE | DE

Source

Location context

Actual

Main-Taunus-Kreis, HE, DE

Source

Development detail

Actual

2.8-Acre site; one planned hyperscale facility; 15,000 square metres; 20 MW critical IT load.

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

Prime Data Centers publishes 20 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

20 MW is the source defined future IT or site design envelope.

Source

Project identity

Actual

Prime Frankfurt FRA01

Source

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

20 MW is the source defined future IT or site design envelope.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

Frankfurt-region development with nearby substation, closed-loop air and liquid cooling and six carriers in proximity.

Cooling system

Planned or represented

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.