Data center siteSite record

Prime Frankfurt FRA01 Data Center Campus

Main-Taunus-Kreis, HE, GermanyPreconstruction
Capacity
20 MW
Planned / design
Lead participant
Prime Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Prime Frankfurt FRA01 Data Center Campus

Prime Frankfurt FRA01 Data Center Campus, also known as Prime Frankfurt FRA01, is a data center project in Main-Taunus-Kreis, HE, DE associated with Prime Data Centers. 2.8-acre site; one planned hyperscale facility; 15,000 square metres; 20 MW critical IT load. Frankfurt-region development with nearby substation, closed-loop air and liquid cooling and six carriers in proximity. 20 MW is the source-defined future IT or site design envelope. Disclosed investment or financing context is recorded with its transaction scope and is not treated as delivered project cost or proof of capacity.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load20 MWDesign · Prime Frankfurt FRA01 Data Center Campus
Future Potential20 MWDesign · Prime Frankfurt FRA01 Data Center Campus

Development

1 phases · 2 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

20 MW is the source-defined future IT or site design envelope. It is not operating IT load.

Aug 27, 2026
Current source record reviewed for Prime Frankfurt FRA01
Completed
Aug 30, 2026
No operating status inferred from development evidence
Completed

Infrastructure

Electric GridPlanned Or Represented

Frankfurt-region development with nearby substation, closed-loop air and liquid cooling and six carriers in proximity.

Cooling SystemPlanned Or Represented

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
Prime Frankfurt FRA01 | Main-Taunus-Kreis | HE | DE
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
20 MW
Design
Capacity Basis
Prime Data Centers publishes 20 MW of critical IT capacity for this record boundary.
Actual
Location Context
Prime Frankfurt FRA01 | Main-Taunus-Kreis | HE | DE
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
20 MW
Design
Capacity Basis
20 MW is the source defined future IT or site design envelope.
Actual
Project Identity
Prime Frankfurt FRA01
Actual
Location Context
Main-Taunus-Kreis, HE, DE
Actual
Lifecycle Status
Preconstruction
Actual
Development Detail
2.8-Acre site; one planned hyperscale facility; 15,000 square metres; 20 MW critical IT load.
Actual
Capacity Basis
20 MW is the source defined future IT or site design envelope.
Actual