Prime ESB01 Esbjerg Campus

Esbjerg, Region of Southern Denmark, DenmarkPreconstructionDiligence evidence / compare baseline
Capacity
550 MW
Planned / design
Lead participant
Brunswick Real Estate
Developer
Last updated
Sep 13, 2026
Most recent public record update

About Prime ESB01 Esbjerg Campus

Prime ESB01 is a proposed AI-ready data center campus on a 640,000-square-meter site at Nordre Tovrupvej in Esbjerg, Denmark, developed by Prime Data Centers with Brunswick Real Estate. Prime entered the environmental-impact-assessment process in March 2026 and describes a 160 MW IT first phase representing approximately €2 billion of investment. Subject to demand, permitting and grid agreements, the campus could expand to an assessed 550 MW IT with about €6 billion of total buildout investment. Construction of the first facility is targeted for 2027 and initial go-live for late 2029. The site is planned for national-grid power, is near six major submarine cable systems and may later support waste-heat recovery. The 550 MW figure remains a conditional full-build design envelope.

Capacity

Planned / design
Operating capacityNo reviewed operating IT-capacity value is included in this record.

No additional capacity claims are published.

Development

2 phases · 3 milestones
ESB01 Phase 1Planned

First phase planned at 160 MW IT.

ESB01 full buildoutPlanned

Full assessed campus envelope up to 550 MW IT.

Mar 27, 2026
Prime announced ESB01 and entry into EIA process
Completed
Jan 1, 2027
Construction anticipated to commence in 2027, subject to EIA, permits and grid agreements
Forecast
Dec 1, 2029
Initial capacity targets late-2029 go-live
Forecast

Infrastructure

Electric GridPlanned Or Represented

Campus is planned to connect to Denmark's national electricity grid; a grid agreement remains a prerequisite.

FiberReported Context

6 cable systems

The site is near six major submarine cable systems; this is proximity/connectivity context rather than six dedicated facility connections.

Heat ReusePotential Or Planned

Prime plans to explore future waste-heat recovery and district-heating integration.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
0
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Claim review and source dates are shown separately. A record update date is not a claim review date.

8 facts
Site Area
640,000 square meters
design
Phase1 It Capacity
160 MW
design
Campus It Capacity Assessed
550 MW
design
Phase1 Investment
€2,000,000,000
design
Full Build Investment
€6,000,000,000
design
Permanent Jobs Phase1 Minimum
150 jobs
forecast
Construction Jobs Approx
1,000 jobs
forecast
Nearby Submarine Cable Systems
6 cable systems
actual