PowerHouse Grand Prairie
- Planned / design
- 500 MW
- Updated
- Oct 28, 2026
PowerHouse’s current Grand Prairie specifications give a Q1 2027 delivery target, while a separate timeline on the same page still lists construction and power delivery in Q4 2026. These remain forecasts, not confirmation of energization or building completion. PowerHouse Grand Prairie is a hyperscale campus developed by PowerHouse Data Centers and Provident in Texas. The broader site plan includes a 1.8 GW switchyard, while the first 500 MW tranche has been described as approved through the ERCOT planning process with initial delivery previously targeted for 2026. The available public sources do not establish a single project-scoped capacity figure; 1.8 GW is the maximum utility-power infrastructure ceiling. Actual energized IT load, building delivery, customers and later phases remain prospective.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
PowerHouse Grand Prairie is a hyperscale campus developed by PowerHouse Data Centers and Provident in Texas. The broader site plan includes a 1.8 GW switchyard, while the first 500 MW tranche has been described as approved through the ERCOT planning process with initial delivery targeted for 2026. The available public sources do not establish a single project-scoped capacity figure.8 GW ultimate infrastructure ceiling. Actual energized IT load, building delivery, customers and later phases remain prospective.
Milestones (2)
Apr 30, 2025 · Recorded actual event
Completed · Announced
Source not linkedMay 2026 · Forecast / planned record
Forecast · Forecast completion
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- PowerHouse Grand Prairie project source · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
Actual500 MW future full build site capacity; not measured operating IT load. Corrected from a portfolio/market rollup to PowerHouse’s published Grand Prairie site boundary.
SourceCapacity basis
Actual500 MW is the narrower approved initial tranche; the 1,800 MW switchyard is a longer term infrastructure ceiling.
SourceInfrastructure & permits
Technical details (2)
Planned or represented
1,800 MW
Ultimate infrastructure ceiling.
Secured or contracted
500 MW
Initial approved tranche; not operating load.