Cartis diligence evidence schedule
Polarnode Kuopio Mustakorpi
PRJ-1312 · Site · Kuopio, Finland
Record last updated Oct 29, 2026
Scope and capacity
Polarnode’s proposed Mustakorpi development in Kuopio has an approximately 32-hectare design reservation within a 92.7-hectare EIA area. The operator advertises 200 MW grid capacity and a 2028 power target; the October 2026 programme’s approximately 250 MW availability figure remains unreconciled. The programme assesses approximately 385 MW IT and 500 MW total electricity demand, not approved capacity. The programme reports zoning began in spring 2026, insufficient fibre for the development and district heating at least 1 km away. EIA consultation opened October 21, with comments scheduled to close November 19, 2026.
Headline: 200 MW Utility capacity
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (5)
Grid capacity MW · 200 MW
Forecast · Polarnode Kuopio Mustakorpi (Project)
Claim 162105 · Recorded claim type: Forecast · Review: Approved · Claim date: Not stated
Headline treatment: Selected headline
- Current Mustakorpi specifications
Polarnode · Document date: Not stated · Primary
Source reference: SRC-8190 · Company announcement · Recorded authority: Party primary
Source URL
https://www.polarnode.fi/projects/kuopio/
https://www.polarnode.fi/projects/kuopio/
Land and site control context · The October 14, 2026 EIA programme identifies an approximately 32 ha design reservation within a broader 92.7 ha assessed project area. The reservation covers portions of 297-411-3-94, 297-411-3-89, 297-411-3-131 and 297-411-3-33. Programme reported approval was December 10, 2025, with an 18-month term from signing; no expiry is calculated without the signature date. Reservation is not ownership or verified current title.
Reported rounded · Polarnode Kuopio Mustakorpi (Project)
Claim 162513 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated
- Polarnode Kuopio EIA programme, version B, October 14, 2026
Polarnode / environmental assessment programme · Document date: Oct 14, 2026 · Primary
Source reference: SRC-8240 · Regulatory record · Recorded authority: Party primary
Source URL
https://www.ymparisto.fi/sites/default/files/documents/Polarnode%20Kuopio%20-%20YVA-ohjelma%20-%2020261014%20-%20lopullinen%20versio_0.pdf
https://www.ymparisto.fi/sites/default/files/documents/Polarnode%20Kuopio%20-%20YVA-ohjelma%20-%2020261014%20-%20lopullinen%20versio_0.pdf
- Current Mustakorpi specifications
Polarnode · Document date: Not stated · Corroborating
Source reference: SRC-8190 · Company announcement · Recorded authority: Party primary
Source URL
https://www.polarnode.fi/projects/kuopio/
https://www.polarnode.fi/projects/kuopio/
Site location · Mustakorpi development between Hiltulanlahti and Pellesmäki, Kuopio. The operator advertises approximately 32 ha; the October 2026 EIA programme places that design reservation within a broader 92.7 ha assessed project area. These are different boundaries of the same undertaking, not a surveyed ownership polygon.
Reported rounded · Polarnode Kuopio Mustakorpi (Project)
Claim 162514 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated
- Polarnode Kuopio EIA programme, version B, October 14, 2026
Polarnode / environmental assessment programme · Document date: Oct 14, 2026 · Primary
Source reference: SRC-8240 · Regulatory record · Recorded authority: Party primary
Source URL
https://www.ymparisto.fi/sites/default/files/documents/Polarnode%20Kuopio%20-%20YVA-ohjelma%20-%2020261014%20-%20lopullinen%20versio_0.pdf
https://www.ymparisto.fi/sites/default/files/documents/Polarnode%20Kuopio%20-%20YVA-ohjelma%20-%2020261014%20-%20lopullinen%20versio_0.pdf
- Current Mustakorpi specifications
Polarnode · Document date: Not stated · Corroborating
Source reference: SRC-8190 · Company announcement · Recorded authority: Party primary
Source URL
https://www.polarnode.fi/projects/kuopio/
https://www.polarnode.fi/projects/kuopio/
Eia programme capacity scenarios context · Version B of the October 14, 2026 programme assesses VE1 at approximately 385 MW IT and 500 MW total electricity demand, with backup generator fuel input approximately 1,700 MW thermal. VE2 adds optional 200 MW electrical gas generation with indicative 465–515 MW thermal fuel input. These are maximum impact assessment alternatives, not approval, a selected configuration, commissioned capacity or current IT load. Electrical output, demand and thermal fuel input must not be added or converted.
Reported rounded · Polarnode Kuopio Mustakorpi (Project)
Claim 162516 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated
- Polarnode Kuopio EIA programme, version B, October 14, 2026
Polarnode / environmental assessment programme · Document date: Oct 14, 2026 · Primary
Source reference: SRC-8240 · Regulatory record · Recorded authority: Party primary
Source URL
https://www.ymparisto.fi/sites/default/files/documents/Polarnode%20Kuopio%20-%20YVA-ohjelma%20-%2020261014%20-%20lopullinen%20versio_0.pdf
https://www.ymparisto.fi/sites/default/files/documents/Polarnode%20Kuopio%20-%20YVA-ohjelma%20-%2020261014%20-%20lopullinen%20versio_0.pdf
Eia programme zoning history context · Programme section 3.3.4/p 12 reports that zoning for the Mustakorpi business area began in spring 2026 and proceeds separately alongside EIA. Spring is the reported precision; no day or quarter is established. The earlier operator forecast remains a separate historical statement.
Reported rounded · Polarnode Kuopio Mustakorpi (Project)
Claim 162517 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated
- Polarnode Kuopio EIA programme, version B, October 14, 2026
Polarnode / environmental assessment programme · Document date: Oct 14, 2026 · Primary
Source reference: SRC-8240 · Regulatory record · Recorded authority: Party primary
Source URL
https://www.ymparisto.fi/sites/default/files/documents/Polarnode%20Kuopio%20-%20YVA-ohjelma%20-%2020261014%20-%20lopullinen%20versio_0.pdf
https://www.ymparisto.fi/sites/default/files/documents/Polarnode%20Kuopio%20-%20YVA-ohjelma%20-%2020261014%20-%20lopullinen%20versio_0.pdf
Counterparties and capital
Polarnode · Developer · CMP-1730
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.