Polarise Amberg AI Data Center

Amberg, Bavaria, GermanyPreconstruction
Evidence
Planned / design
30 MW
Updated
Oct 28, 2026

Polarise is developing an AI data center in Amberg, Bavaria. Its March 2026 announcement describes an initial 30 MW phase targeted for mid-2027 and longer-term scalability to 120 MW. AI-ready modular design with a stated pathway to 120 MW.

Capacity

Reported capacity

Planned / design or future potential

30 MW

Source

Capacity

Planned / design or future potential

30 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

Polarise Amberg AI Data Center: Preconstruction.

Milestones (2)
Polarise Amberg AI Data Center: Planned AI data center; launch targeted for mid-2027.

Mar 10, 2026 · Event timing type not established

In progress · Announced

Source not linked
Polarise Amberg AI Data Center — Preconstruction

Date not disclosed · Event timing type not established

In progress · Status changed

Source not linked

Participants

Polarise

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Polarise AI data center site | Amberg | Unterallgäu | Germany

Source

Location

Actual

Amberg, Bavaria, DE

Source

Development scale

Actual

30 MW planned initial phase; launch targeted mid-2027

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

Polarise states a 30 MW initial phase; 120 MW is future scalability.

Source

Project identity

Actual

Polarise Amberg AI Data Center

Source

Lifecycle status

Actual

Preconstruction

Source

Participant roles

Actual

Polarise

Source

Capacity basis

Actual

30 MW planned or design IT capacity

Source

Infrastructure

Actual

AI-ready modular design with a stated pathway to 120 MW.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

30 MW

30 MW planned or design IT capacity

Site facility

Planned or represented

AI-ready modular design with a stated pathway to 120 MW.

Public-source research. Plans may change. See Evidence for sources and qualifications.