Skip to content

PDG CH1 Chennai Campus

Northern Chennai, Tamil Nadu, IndiaProposed
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

PDG plans a 72 MW, three-building AI-ready campus on 9.3 acres in northern Chennai. A construction start and ready-for-service date have not been publicly disclosed.

Capacity

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

CH1 three-building master planAnnounced or preconstruction

3 buildings

72 MW campus; building names and allocations not disclosed.

Milestones (1)
PDG announces 72 MW Chennai entry

Sep 19, 2024 · Recorded actual event

Completed · Announced

Source not linked

Participants

Princeton Digital Group

Operator

Sources by role

Additional project facts

Milestone announcement

Actual

PDG announces 72 MW Chennai entry

Source

Milestone research verification

Actual

No authoritative construction start or RFS date located

Source

Infrastructure & permits

Technical details (3)
Electric grid

Planned or represented

72 MW

Campus design across three buildings; not delivered load.

Site facility

Planned or represented

29,600 sqm

Operator facility page.

Site facility

Planned or represented

3 buildings

Building identities and MW allocations undisclosed.

Public-source research. Plans may change. See Evidence for sources and qualifications.