Capacity
—
No public figure
Lead participant
Princeton Digital Group
Operator
Last updated
Aug 26, 2026
Most recent public record update
About PDG CH1 Chennai Campus
PDG plans a 72 MW, three-building AI-ready campus on 9.3 acres in northern Chennai. A construction start and ready-for-service date have not been publicly disclosed.
Capacity
Operating capacity—An operating IT-capacity figure has not been publicly disclosed.
No additional capacity claims are published.
Development
1 phases · 1 milestonesCH1 three-building master planAnnounced Or Preconstruction
72 MW campus; building names and allocations not disclosed.
3 buildings
Sep 19, 2024
PDG announces 72 MW Chennai entry
CompletedInfrastructure
Electric GridPlanned Or Represented
72 MW
Campus design across three buildings; not delivered load.
Site FacilityPlanned Or Represented
29,600 sqm
Operator facility page.
Site FacilityPlanned Or Represented
3
Building identities and MW allocations undisclosed.
Project map
0 of 1 project point mappedInfrastructure facts
3
Mapped records
1
Capacity figures
3
No map point available
Power & interconnection: 1Site systems: 2
Facts & sources
Published claims and their source links.
Milestone AnnouncementPDG announces 72 MW Chennai entryActual
PDG announces 72 MW Chennai entry
Milestone Research VerificationNo authoritative construction start or RFS date locatedActual
No authoritative construction start or RFS date located