PAIX DKR1 Dakar Data Center
Les Mamelles, Dakar, DK, SenegalUnder construction
Capacity
—
No public figure
Lead participant
PAIX Data Centres
Operator
Last updated
Aug 22, 2026
Most recent public record update
Capacity
Operating capacity—An operating IT-capacity figure has not been publicly disclosed.
It Load1.2 MWDesign · First operating phase
Development
3 phases · 2 milestonesLand acquisition and construction launchAnnounced Or Preconstruction
Enabling/launch scope only.
First operating phaseUnder Construction
Up to 1.2 MW; opening not confirmed at cutoff.
Future expansionPlanned
Do not assume the first phase equals full build.
Jan 23, 2025
PAIX launches DKR1 construction
CompletedDec 31, 2026
First-phase operating target
ForecastInfrastructure
Electric GridUnder Construction
1.2 MW
designed it or critical power — 1.2 MW; under construction.
FiberPlanned Or Represented
carrier neutral interconnection; planned.
Project map
0 of 1 project point mappedInfrastructure facts
2
Mapped records
1
Capacity figures
1
No map point available
Power & interconnection: 1Fiber & connectivity: 1
Facts & sources
Published claims and their source links.
Project StatusUnder constructionActual
Under construction
Land StatusPurchasedActual
Purchased
Designed It Load1.2 MWDesign
1.2 MW
Usable Space918 sqmReported Rounded
918 sqm
Colocation Space900 sqmActual
900 sqm
Sources report a conflicting figure.
Bay Count330 bayDesign
330 bay
Construction Jobs200 jobReported Rounded
200 job
Operational Jobs20 jobReported Rounded
20 job
Submarine Cable ContextACE; MainOne; SAT-3; SHARE; 2Africa planned in sourceActual