Data center siteSite record

PAIX DKR1 Dakar Data Center

Les Mamelles, Dakar, DK, SenegalUnder construction
Capacity
No public figure
Lead participant
PAIX Data Centres
Operator
Last updated
Aug 22, 2026
Most recent public record update

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load1.2 MWDesign · First operating phase

Development

3 phases · 2 milestones
Land acquisition and construction launchAnnounced Or Preconstruction

Enabling/launch scope only.

First operating phaseUnder Construction

Up to 1.2 MW; opening not confirmed at cutoff.

Future expansionPlanned

Do not assume the first phase equals full build.

Jan 23, 2025
PAIX launches DKR1 construction
Completed
Dec 31, 2026
First-phase operating target
Forecast

Infrastructure

Electric GridUnder Construction

1.2 MW

designed it or critical power — 1.2 MW; under construction.

FiberPlanned Or Represented

carrier neutral interconnection; planned.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

9 facts
Project Status
Under construction
Actual
Land Status
Purchased
Actual
Designed It Load
1.2 MW
Design
Usable Space
918 sqm
Reported Rounded
Colocation Space
900 sqm
Actual
Bay Count
330 bay
Design
Construction Jobs
200 job
Reported Rounded
Operational Jobs
20 job
Reported Rounded
Submarine Cable Context
ACE; MainOne; SAT-3; SHARE; 2Africa planned in source
Actual