Cartis diligence evidence schedule

OpCore Montereau Data Center

PRJ-0608 · Site · Vernou-la-Celle-sur-Seine / La Grande-Paroisse, France

Captured 2026-09-06T04:12:49.549Z · Record last updated 2026-08-27

SHA-256: b2c7455fe2fc172394e7394533ab725725d1e88bfcd6431b3b4456db8a24b768

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

OpCore is redeveloping the former EDF thermal-power site at Montereau-Fault-Yonne, France as a large data center campus. The program carries an investment of approximately €4 billion and a power subscription exceeding 400 MW, with an initial phase targeted for 2027. The 400 MW figure is contracted grid supply rather than operating IT load.

Headline: 400 MW Contracted

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Location Context · Former Montereau thermal power plant site | Seine et-Marne | France

actual · OpCore Montereau Data Center (project)

Claim 54741 · Review: Approved · Claim date: Not published

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region

Lifecycle Status · Preconstruction

actual · OpCore Montereau Data Center (project)

Claim 54742 · Review: Approved · Claim date: Not published

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region

Reported Capacity · 400 MW

Planned / design or future potential · OpCore Montereau Data Center (project)

Claim 54743 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region

Capacity Basis · Power subscription stated as more than 400 MW; stored floor value

actual · OpCore Montereau Data Center (project)

Claim 54744 · Review: Approved · Claim date: Not published

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region

Project Identity · OpCore Montereau Data Center

actual · OpCore Montereau Data Center (project)

Claim 119627 · Review: Approved · Claim date: Not published

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region
  2. EDF 2025 half-year results

    EDF · Document date: 2025-07-24 · Corroborating

    https://www.edf.fr/sites/groupe/files/2025-07/2025-07-24-pr-edf-half-year-results.pdf

Lifecycle Status · Development program

actual · OpCore Montereau Data Center (project)

Claim 119628 · Review: Approved · Claim date: Not published

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region
  2. EDF 2025 half-year results

    EDF · Document date: 2025-07-24 · Corroborating

    https://www.edf.fr/sites/groupe/files/2025-07/2025-07-24-pr-edf-half-year-results.pdf

Location · Vernou la-Celle sur-Seine / La Grande-Paroisse, Seine et-Marne, FR

actual · OpCore Montereau Data Center (project)

Claim 119629 · Review: Approved · Claim date: Not published

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region
  2. EDF 2025 half-year results

    EDF · Document date: 2025-07-24 · Corroborating

    https://www.edf.fr/sites/groupe/files/2025-07/2025-07-24-pr-edf-half-year-results.pdf

Participant Roles · OpCore, EDF

actual · OpCore Montereau Data Center (project)

Claim 119630 · Review: Approved · Claim date: Not published

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region
  2. EDF 2025 half-year results

    EDF · Document date: 2025-07-24 · Corroborating

    https://www.edf.fr/sites/groupe/files/2025-07/2025-07-24-pr-edf-half-year-results.pdf

Capacity · 400 MW

actual · OpCore Montereau Data Center (project)

Claim 119631 · Review: Approved · Claim date: Not published

Headline treatment: Selected headline

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region
  2. EDF 2025 half-year results

    EDF · Document date: 2025-07-24 · Corroborating

    https://www.edf.fr/sites/groupe/files/2025-07/2025-07-24-pr-edf-half-year-results.pdf

Capacity Basis · More than 400 MW contracted grid supply

actual · OpCore Montereau Data Center (project)

Claim 119632 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region
  2. EDF 2025 half-year results

    EDF · Document date: 2025-07-24 · Corroborating

    https://www.edf.fr/sites/groupe/files/2025-07/2025-07-24-pr-edf-half-year-results.pdf

Development Scale · OpCore is redeveloping the former EDF thermal power site at Montereau-Fault-Yonne, France as a large data center campus. The program carries an investment of approximately €4 billion and a power subscription exceeding 400 MW, with an initial phase targeted for 2027

Planned / design or future potential · OpCore Montereau Data Center (project)

Claim 119633 · Review: Approved · Claim date: Not published

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region
  2. EDF 2025 half-year results

    EDF · Document date: 2025-07-24 · Corroborating

    https://www.edf.fr/sites/groupe/files/2025-07/2025-07-24-pr-edf-half-year-results.pdf

Infrastructure · The 400 MW figure is contracted grid supply rather than operating IT load.

actual · OpCore Montereau Data Center (project)

Claim 119634 · Review: Approved · Claim date: Not published

  1. EDF and OpCore to develop a high-power data center at Montereau

    EDF · Document date: 2025-11-17 · Primary

    https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-and-opcore-to-develop-a-high-power-data-center-on-site-of-former-thermal-power-plant-in-montereau-vallee-de-la-seine-wider-paris-metropolitan-region
  2. EDF 2025 half-year results

    EDF · Document date: 2025-07-24 · Corroborating

    https://www.edf.fr/sites/groupe/files/2025-07/2025-07-24-pr-edf-half-year-results.pdf

Counterparties and capital

EDF · Utility Provider · CMP-0928

OpCore · Developer · CMP-1380

Investment Commitment

€4,000,000,000 · 2025-07-24

Planned Montereau redevelopment investment.

OpCore (Sponsor)

Financing record 244; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.