NTT DATA Paris Data Center Campus

Paris Region, Île-de-France, FranceUnder construction
Evidence
Planned critical IT
84 MW
Updated
Oct 28, 2026

NTT DATA Paris Data Center Campus, also known as NTT Paris Campus, is a data center project in Paris Region, IDF, FR associated with NTT DATA. 14.4-hectare development; three planned data centers; 84 MW planned critical IT load. Paris-region hyperscale development planned as three high-density, carrier-connected facilities. 84 MW is the source-defined future IT or site design envelope.

Capacity

Reported capacity

Design

84 MW

Source

Reported capacity

Planned / design or future potential

84 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryUnder construction

84 MW is the source-defined future IT or site design envelope. It is not operating IT load.

Milestones (1)
NTT DATA announced the first Paris campus

Feb 13, 2024 · Recorded actual event

Completed · Announced

Source not linked

Participants

NTT DATA

Developer

Sources by role

Site & development

Location context

Actual

NTT Paris Campus | Paris Region | IDF | FR

Source

Location context

Actual

NTT Paris Campus | Paris Region | IDF | FR

Source

Site area

Actual

14.4 hectares

Source

Building count

Design

3 data centers

Source

Additional project facts

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

NTT DATA publishes 84 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

84 MW is the source defined future IT or site design envelope.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Planned or represented

Paris-region hyperscale development planned as three high-density, carrier-connected facilities.

Cooling system

Planned or represented

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric grid

Planned or represented

84 MW IT future

Day-one power reservation supports a three-building plan; no energized operating load is asserted.

Public-source research. Plans may change. See Evidence for sources and qualifications.