Skip to content
← Return to profile

Cartis diligence evidence schedule

NorthC Delft

PRJ-1276 · Site · Delft, Netherlands

Captured 2026-10-06T04:33:37.563Z · Record last updated 2026-10-05

SHA-256: 0dde3f7b9bbdce38be5d7e1f03122bc17ef95a0806c51cefd3103f94794d8622

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

NorthC Delft is an operating colocation facility at Heertjeslaan 1, 2629 JG Delft. NorthC’s factsheet describes 5,000 square metres of total surface and 1,800 square metres of data-floor area. Its electrical architecture uses 2 × 23 kV utility feeds, N+1, with UPS N+1 and backup generators 2N. Cooling uses direct adiabatic air cooling, n+1. The facility offers carrier- and cloud-neutral interconnection, A/B meet-me rooms and access to NorthC’s Region Connect Ring. The operator lists 1.5 MW of installed electrical capacity. The rating describes the facility’s installed electrical capacity. The site is located in Delft’s Technopolis area. In January 2012, BAM announced construction of the Delft datacenter for The Datacenter Group and set a 1 September 2012 availability target.

Headline: 1.5 MW Facility design

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Street Address · Heertjeslaan 1, 2629 JG Delft

actual · NorthC Delft (project)

Claim 159097 · Review: Approved · Claim date: Not published

  1. Delft data center

    NorthC Datacenters · Document date: Not published · Primary

    https://www.northcdatacenters.com/en/northc-datacenters/delft/

Facility Area · 5,000 sqm

actual · NorthC Delft (project)

Claim 159098 · Review: Approved · Claim date: Not published

  1. Delft data center factsheet

    NorthC Datacenters · Document date: Not published · Primary

    https://www.northcdatacenters.com/wp-content/uploads/2023/10/Delft_Datacenter_Factsheet_NorthC_NL.pdf

Data Floor Area · 1,800 sqm

actual · NorthC Delft (project)

Claim 159099 · Review: Approved · Claim date: Not published

  1. Delft data center factsheet

    NorthC Datacenters · Document date: Not published · Primary

    https://www.northcdatacenters.com/wp-content/uploads/2023/10/Delft_Datacenter_Factsheet_NorthC_NL.pdf

Facility Design Electrical Capacity Mw · 1.5 MW

Facility electrical / design capacity · NorthC Delft (project)

Claim 159100 · Review: Approved · Claim date: Not published

Headline treatment: Selected headline

  1. Delft data center factsheet

    NorthC Datacenters · Document date: Not published · Primary

    https://www.northcdatacenters.com/wp-content/uploads/2023/10/Delft_Datacenter_Factsheet_NorthC_NL.pdf

Ups Redundancy · UPS N+1

actual · NorthC Delft (project)

Claim 159101 · Review: Approved · Claim date: Not published

  1. Delft data center factsheet

    NorthC Datacenters · Document date: Not published · Primary

    https://www.northcdatacenters.com/wp-content/uploads/2023/10/Delft_Datacenter_Factsheet_NorthC_NL.pdf

Historical Ownership · The Datacenter Group owned and operated its existing Delft facility in August 2018

actual · NorthC Delft (project)

Claim 159102 · Review: Approved · Claim date: Not published

  1. Datacenter connectivity

    AFIBER · Document date: Not published · Corroborating

    https://www.afiber.net/en/solutions/datacenter-connectivity/
  2. Rabobank Bouwfonds Communication Infrastructure Fund

    Van Lanschot Kempen · Document date: Not published · Primary

    https://www.vanlanschotkempen.com/en-nl/investment-banking/corporate-finance/transactions/2018/rbcif-august

Cooling Water Treatment · Pathema reports circular, chemical free cooling water treatment installations delivered in Delft during 2019–2022. Performance percentages apply to the multi site case study.

actual · NorthC Delft (project)

Claim 159104 · Review: Approved · Claim date: Not published

  1. NorthC cooling-water treatment case study

    Pathema · Document date: Not published · Primary

    https://www.pathema.nl/en/case/northc

Counterparties and capital

NorthC Datacenters · Operator · CMP-1714

Royal BAM Group · Contractor · CMP-1716

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.