Meta Prineville Data Center

Prineville, Oregon, United StatesOperating / Stabilized
Capacity
No public figure
Lead participant
Meta Platforms, Inc.
Operator · Owner
Last updated
Aug 25, 2026
Most recent public record update

About Meta Prineville Data Center

Meta's first purpose-built data center campus now comprises 11 buildings and nearly 4.6 million square feet. Meta Prineville Data Center is located in Prineville, OR, US and is a data center campus in operating status. Participants include Meta Platforms, Inc. as owner, Meta Platforms, Inc. as operator, Pacific Power / PacifiCorp as utility. Development comprises Initial purpose-built campus (operating), Third-building expansion (operating), 2018 two-building expansion (operating). Key milestones include Meta announces the 900,000-square-foot expansion (2021-03-18) and Local reporting corroborates the 11-building campus (2026-06-30). grid renewable program — 977 MW generation: Meta-supported renewable projects on PacifiCorp's grid; this is external generation, not campus capacity. water efficiency: First-party fact sheet describes water-efficiency practices but publishes no utility volume.

Projects sharing a market, utility, or organization.

1 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

4 phases · 5 milestones
Initial purpose-built campusOperational

Original Prineville facility; later expansions remain within the same campus.

1 building

Third-building expansionOperational

Historical third-building scope; exact commissioning date remains open.

1 building

2018 two-building expansionOperational

USD750 million announcement bringing planned campus area above 3.2 million square feet.

2 buildings

2021 two-building expansionOperational

900,000-square-foot expansion that produced the 11-building / 4.6 million-square-foot campus.

2 buildings

Apr 7, 2011
Prineville operating facility anchors the Open Compute launch
Completed
Sep 1, 2015
Meta announces a third Prineville data center building
Completed
Oct 23, 2018
Meta reports the USD750 million expansion
Completed
Mar 18, 2021
Meta announces the 900,000-square-foot expansion
Completed
Jun 30, 2026
Local reporting corroborates the 11-building campus
Completed

Infrastructure

Renewable Energy SupplyOperational

977 MW generation

Meta-supported renewable projects on PacifiCorp's grid; this is external generation, not campus capacity.

Cooling SystemOperational

First-party fact sheet describes water-efficiency practices but publishes no utility volume.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

21 facts
Current Status
Operating
Actual
Building Count
11
Reported Rounded
Campus Floor Area
4.6 million square feet
Reported Rounded
Cumulative Investment
$2 billion plus
Reported Rounded
Operational Jobs
350 jobs plus
Reported Rounded
Peak Construction Workers
1,000 workers
Reported Rounded
Local Community Funding
$5.30 million
Reported Rounded
Meta Supported Grid Renewables
977 MW generation
Reported Rounded
Renewable Matching
True
Actual
Campus It Capacity Disclosed
False
Actual
Initial Operation Year
2011
Reported Rounded
Initial Open Compute Site
True
Actual
Third Building Additional Investment
$200 million plus
Reported Rounded
2018 Expansion Investment
$750 million
Reported Rounded
2018 Expansion Buildings
2
Reported Rounded
2018 Planned Floor Area
3.2 million square feet plus
Reported Rounded
2018 Additional Jobs
100 jobs
Reported Rounded
2021 Expansion Buildings
2
Reported Rounded
2021 Expansion Floor Area
900,000 square feet
Reported Rounded
Water Efficiency Program
True
Actual
Owner Operator
Meta Platforms
Actual