Meta Odense Data Center
About Meta Odense Data Center
One Meta campus with successive building phases, operational heat recovery and two halted 2022 expansion buildings. Meta Odense Data Center is in Odense / Tietgenbyen, 83, DK and is a data center campus with operational status. Participants include Meta Platforms, Inc. as developer, Fjernvarme Fyn as utility, Ramboll as engineering contractor, Per Aarsleff A/S as contractor. Development comprises Initial campus phase (operational), 2020 expansion (operational), Single continued 2022 building (unknown). Key milestones include DKK2.4 billion civil-works contract terminated. (2022-12-13) and Meta confirms two buildings halted and one continued. (2022-12-15). district heat recovery — 45 MW thermal: Tietgenbyen Energy Center uses ammonia heat pumps and a water loop to raise server heat to district-heating temperature. surplus heat delivery — 165000 MWh/year: Meta fact-sheet basis; Ramboll engineering case reports 215,000 MWh/year and remains a parallel dated measure. Permitting includes municipal building and operating permits for Odense campus operational/building permit set (partially researched).
Capacity
No additional capacity claims are published.
Development
4 phases · 7 milestonesOriginal 55,000-square-metre development.
1 building
Approximately 30,000 square metres and expanded heat recovery.
1 building
Industry source said one of three buildings would continue; current Meta fact sheet does not identify it separately.
1 building
Canceled civil-works package; not operating capacity.
2 buildings
Infrastructure
45 MW thermal
Tietgenbyen Energy Center uses ammonia heat pumps and a water loop to raise server heat to district-heating temperature.
165,000 MWh/year
Meta fact-sheet basis; Ramboll engineering case reports 215,000 MWh/year and remains a parallel dated measure.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.