Data center siteSite record

Meta DeKalb Data Center

DeKalb, Illinois, United StatesOperating / Stabilized
Capacity
No public figure
Lead participant
Meta Platforms, Inc.
Operator
Last updated
Aug 22, 2026
Most recent public record update

About Meta DeKalb Data Center

Meta's DeKalb campus has served traffic since November 2023, and its main contractor reports completion in December 2024 after the original two-building plan expanded to five buildings.

Projects sharing a market, utility, or organization.

1 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Contracted Supply295 MWActual · Illinois renewable-energy support portfolio
Contracted Supply300 MWReported Rounded · Illinois renewable-energy support portfolio
Contracted Supply765 MWActual · Illinois renewable-energy support portfolio

Development

3 phases · 4 milestones
Original two-building DeKalb programOperational

Original campus scope before the 2022 expansion.

2 buildings

Five-building expansionOperational

Building-specific RFS dates and IT MW remain undisclosed.

3 buildings

Illinois renewable-energy support portfolioOperational

Regional generation is not on-site capacity or a one-to-one campus supply figure.

Jan 1, 2020
Meta breaks ground in DeKalb
Completed
Apr 27, 2022
Meta expands DeKalb from two to five buildings
Completed
Nov 29, 2023
Meta DeKalb begins serving traffic
Completed
Dec 1, 2024
Mortenson reports DeKalb campus completion
Completed

Infrastructure

Electric GridOperational

No authoritative campus MW figure found.

Renewable Energy SupplyReported Context

295 MW

Off-site projects; never assigned as DeKalb load or direct physical supply.

Renewable Energy SupplyReported Context

300 MW

Rounded historical portfolio figure; not added to or reconciled with 295 MW.

Renewable Energy SupplyReported Context

765 MW

Current broader Illinois portfolio context; not site capacity.

Cooling SystemOperational

Meta reports reuse, rainwater capture and water-efficient cooling; volumes undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
3

No map point available

Power & interconnection: 4Cooling & water: 1

Facts & sources

Published claims and their source links.

16 facts
Current Status
Operating and serving traffic
Actual
Groundbreaking Year
2020
Actual
Original Building Count
2
Actual
Expanded Building Count
5
Actual
Announced Investment
More than $1 billion
Transaction Scope
Operational Jobs
200 jobs
Forecast
Peak Construction Workers
1,200 workers
Actual
Site Area
500 acres
Reported Rounded
Contractor Completion
December 2024
Actual
Campus It Capacity
Undisclosed
Proposal
Illinois Renewable Additions
295 MW
Actual
Illinois Renewable Additions
300 MW
Reported Rounded
Illinois Renewable Additions
765 MW
Actual
Renewable Energy Matching
100% Clean and renewable energy
Actual
Leed Status
Operational data center buildings achieve LEED Gold
Actual
Water Design
Reuses cooling water and captures/infiltrates rainwater
Design