MERLIN Edged Zaragoza-WIND
- Planned critical IT
- 144 MW
- Updated
- Oct 29, 2026
MERLIN’s Zaragoza-WIND proposal describes one 144 MW IT building on 28.8 hectares under its July 2026 scope, replacing an earlier two-building, 150 MW plan. Regional-interest designation does not establish full construction authorisation. Liquid-cooled AI workloads, no water consumption for IT cooling and 87% wind-and-solar self-supply are prospective design commitments, with a battery option under study. The EUR1.225 billion investment estimate is not a financing close, and service in the second half of 2029 remains a target. The project is proposed, not an operating data centre.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
1 building
July 2026 revised 144 MW IT single-building proposal, superseding the prior 150 MW two-building concept. Evidence: SRC-N215-MERLIN-ZARAGOZA-Z1; SRC-N215-MERLIN-BILBAO-M2
Milestones (3)
Mar 10, 2026 · Recorded actual event
Completed · Announced
Sources (1)
- MERLIN Capital Markets Day, Navalmoral slides 37–39 · Mar 10, 2026 · Primary
Jul 22, 2026 · Recorded actual event
Completed · Announced
Sources (1)
- Dated July 22 project announcement · Jul 27, 2026 · Primary
2029 · Forecast / planned record
Forecast · Announced
Sources (1)
- Dated July 22 project announcement · Jul 27, 2026 · Primary
Participants
Developer
Sources by role
Developer (1)
- Dated July 22 project announcement · Jul 27, 2026 · Primary
Site & development
Site location
Reported rounded28.8 Ha site in Botorrita associated with Vientos (Muel) and María (María de Huerva) substations. One revised building, not two campus records.
SourceReviewed zar planning land context
Source reportThe July 22, 2026 agreement, published August 14, declares regional and general interest, designates Merlin Properties Socimi, SA as definitive promoter of the plan and execution projects, and approves the Annex I boundary. It declares public utility and the need for urgent occupation of the affected rights, recognizes MERLIN as expropriation beneficiary, and opens 20 working days of consultation on Annex II. This is not definitive PIGA approval, completed expropriation or proof of title.
SourceTechnical specifications
Reviewed zar grid context
Source reportOrder ECE/1195/2026, published August 14, reports 227.4 MW of electrical demand permissions: 81 MW associated with María 220 kV and 146.4 MW with Los Vientos 220 kV. These are reported permission quantities, not 144 MW IT capacity or energized service. The underlying permission instruments and current holder/transfer chain were not independently inspected.
SourceReviewed zar cooling context
Source reportThe order reports MERLIN’s design claim of PUE 1.15 and closed loop cooling without cooling water consumption. Neither is a measured operating result, and the cooling claim must not be extended to zero total site water use.
SourceAdditional project facts
Reviewed zar timing context
Source reportThe planning memorandum described in the August 14, 2026 order estimates two years of execution after definitive PIGA approval and targets operation in Q3 2029. This is a conditional forecast, not an achieved milestone.
SourceInfrastructure & permits
Technical details (2)
Reported context
Wind/solar self-supply target 87%; battery option remains under study. Not 87% achieved today.
Reported context
Designed for liquid-cooled AI loads and no water consumption for IT cooling; design claim.
Project map
Other · Documented
MERLIN Edged Zaragoza-WIND
Sources (1)
- Dated July 22 project announcement · Jul 27, 2026 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.