Khazna Başkent AI Data Center

Ankara, TürkiyePreconstruction
Evidence
Planned / design
100 MW
Updated
Oct 28, 2026

Khazna Data Centers plans an AI-capable facility in Ankara’s Başkent Organized Industrial Zone. Khazna states potential capacity of up to 100 MW, with a modular first phase designed initially for cloud workloads. Modular facility with energy-efficiency features and solar photovoltaic integration.

Capacity

Reported capacity

Planned / design or future potential

100 MW

Source

Capacity

Planned / design or future potential

100 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

Khazna Başkent AI Data Center: Preconstruction.

Milestones (2)
Khazna Başkent AI Data Center: Planned AI-capable facility after site acquisition.

Apr 30, 2025 · Event timing type not established

In progress · Announced

Source not linked
Khazna Başkent AI Data Center — Preconstruction

Date not disclosed · Event timing type not established

In progress · Status changed

Source not linked

Participants

Khazna Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Başkent Organized Industrial Zone | Ankara | Türkiye

Source

Location

Actual

Ankara, Ankara, TR

Source

Development scale

Actual

Up to 100 MW potential capacity; site secured in Başkent OIZ

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

Khazna states potential capacity of up to 100 MW.

Source

Project identity

Actual

Khazna Başkent AI Data Center

Source

Lifecycle status

Actual

Preconstruction

Source

Participant roles

Actual

Khazna Data Centers

Source

Capacity basis

Actual

100 MW planned or design IT capacity

Source

Infrastructure

Actual

Modular facility with energy efficiency features and solar photovoltaic integration.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

100 MW

100 MW planned or design IT capacity

Site facility

Planned or represented

Modular facility with energy-efficiency features and solar photovoltaic integration.

Public-source research. Plans may change. See Evidence for sources and qualifications.