Data center siteSite record

Kahla Project

Marquez, Texas, United StatesProposed
Capacity
No public figure
Lead participant
Belltown Power
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Kahla Project

Kahla is Belltown Power’s proposed energy-and-data development near Marquez in Leon County, Texas. Developer materials describe a multi-phase campus paired with power and storage infrastructure, but the tracked 1.5 GW data center figure is not yet established as operating or contracted load. The battery project, generation mix, ERCOT interconnection, land use, customers, water, permits, financing and phase dates require continued reconciliation.

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 0 milestones
Energy and campus interconnection planningAnnounced Or Preconstruction

Kahla is Belltown Power’s proposed energy-and-data development near Marquez in Leon County, Texas. Developer materials describe a multi-phase campus paired with power and storage infrastructure, but the tracked 1.5 GW data center figure is not yet established as operating or contracted load. The available public sources do not establish a single project-scoped capacity figure. The battery project, generation mix, ERCOT interconnection, land use, customers, water, permits, financing and phase dates require continued reconciliation.

Infrastructure

Battery StoragePlanned Or Represented

200.9 MW

Separate energy infrastructure; not IT load.

Electric GridUnknown

1,500 MW

Secondary data center estimate; headline withheld.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 1Generation & storage: 1

Facts & sources

Published claims and their source links.

7 facts
Location Context
Kahla Project | Marquez | Texas | US
Actual
Lifecycle Status
Proposed
Actual
Capacity Basis
1,500 MW future full build site capacity; not measured operating IT load.
Actual
Location Context
Kahla Project | Marquez | Texas | US
Actual
Lifecycle Status
Proposed
Actual
Developer
Belltown Power
Actual
Capacity Status
1.5 GW data center figure remains unverified
Actual