Data center siteSite record

Iron Mountain WPA-1 Western Pennsylvania Data Center

Boyers, Pennsylvania, United StatesOperating / Stabilized
Capacity
15.5 MW
Planned critical IT
Lead participant
Iron Mountain Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Iron Mountain WPA-1 Western Pennsylvania Data Center

Iron Mountain WPA-1 Western Pennsylvania Data Center, also known as Iron Mountain WPA-1, is a data center project in Boyers, PA, US. Underground Western Pennsylvania facility with 15.5 MW of total capacity on a secure former-limestone-mine campus. N+1 power design with redundant feeds and geothermal cooling supported by an underground reservoir. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load15.5 MWDesign · Iron Mountain WPA-1 Western Pennsylvania Data Center
It Load14.2 MWDesign · Iron Mountain WPA-1 Western Pennsylvania Data Center

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

Iron Mountain WPA-1 Western Pennsylvania Data Center, also known as Iron Mountain WPA-1, is a data center project in Boyers, PA, US. Underground Western Pennsylvania facility with 15.5 MW of total capacity on a secure former-limestone-mine campus. N+1 power design with redundant feeds and geothermal cooling supported by an underground reservoir. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridOperational

14.2 MW

14.2 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility-power or design boundary is retained as a separate assertion and is not presented as current operating IT.

FiberOperational

N+1 power design with redundant feeds and geothermal cooling supported by an underground reservoir.

Cooling SystemOperational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

17 facts
Location Context
WPA-1 | Boyers | PA | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
15.5 MW
Design
Capacity Basis
Iron Mountain publishes 15.5 MW for the WPA-1 facility record boundary.
Actual
Location Context
WPA-1 | Boyers | PA | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
14.2 MW
Design
Capacity Basis
14.2 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility power or design boundary is retained as a separate assertion and is not presented as current operating IT.
Actual
Operator Or Developer
Iron Mountain Data Centers
Actual
Project Location
Boyers, PA, US
Actual
Current Lifecycle
Operating or in phased operation
Actual
Capacity Classification
It load
Actual
Capacity Basis
14.2 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility power or design boundary is retained as a separate assertion and is not presented as current operating IT.
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Renewable Energy Matching
Operator states 100% matched renewable energy where applicable
Actual
Sec Capacity Comparison
Q2 2026 leaseable and development schedules reviewed
Actual