Data center siteSite record

Iron Mountain RCH-2 Richmond Data Center

Sandston, Virginia, United StatesPreconstruction
Capacity
48 MW
Planned critical IT
Lead participant
Iron Mountain Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Iron Mountain RCH-2 Richmond Data Center

Iron Mountain RCH-2 Richmond Data Center is one of four named future buildings in Iron Mountain’s White Oak Technology Park expansion. The building design is 48 MW, while Q2 2026 SEC reporting keeps 216 MW of Richmond future phases in held-for-development rather than under-construction capacity. The profile records the 300 MVA campus substation plan and Virginia incentive performance context without claiming construction commencement or a building-specific benefit. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load48 MWDesign · Iron Mountain RCH-2 Richmond Data Center
Future Potential48 MWDesign · Iron Mountain RCH-2 Richmond Data Center

Development

1 phases · 1 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

Iron Mountain RCH-2 Richmond Data Center is one of four named future buildings in Iron Mountain’s White Oak Technology Park expansion. The building design is 48 MW, while Q2 2026 SEC reporting keeps 216 MW of Richmond future phases in held-for-development rather than under-construction capacity. The profile records the 300 MVA campus substation plan and Virginia incentive performance context without claiming construction commencement or a building-specific benefit. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridPlanned Or Represented

48 MW

48 MW is the named future-building design within 216 MW of Richmond phases held for development; construction commencement is not established by Q2 2026 SEC reporting.

FiberPlanned Or Represented

Planned Block N+1 facility with A/B underground feeds on a campus served by a dedicated 300 MVA substation and a new 230 kV double-circuit loop.

Cooling SystemPlanned Or Represented

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

18 facts
Location Context
RCH-2 | Sandston | VA | US
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
48 MW
Design
Capacity Basis
Iron Mountain publishes 48 MW for the RCH-2 facility record boundary.
Actual
Location Context
RCH-2 | Sandston | VA | US
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
48 MW
Design
Capacity Basis
48 MW is the named future building design within 216 MW of Richmond phases held for development; construction commencement is not established by Q2 2026 SEC reporting.
Actual
Operator Or Developer
Iron Mountain Data Centers
Actual
Project Location
Sandston, VA, US
Actual
Current Lifecycle
Under development
Actual
Capacity Classification
Future potential
Actual
Capacity Basis
48 MW is the named future building design within 216 MW of Richmond phases held for development; construction commencement is not established by Q2 2026 SEC reporting.
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Renewable Energy Matching
Operator states 100% matched renewable energy where applicable
Actual
Sec Capacity Comparison
Q2 2026 leaseable and development schedules reviewed
Actual
Dedicated Substation
300 MVA
Design