IREN Bundey AI Data Center Campus
About IREN Bundey AI Data Center Campus
IREN is planning a large data center campus near Bundey in South Australia. The federal environmental referral describes three data halls of up to 200 MW of IT capacity each within an 800 MW site connection and a six-to-eight-year staged build. IREN is associated with the development in Bundey, Mid Murray Council area, South Australia, AU. The disclosed development scope includes 600 MW planned IT load across three halls; 800 MW site connection envelope; federal environmental referral under review; energization planned from 2028. Power and physical infrastructure include four 330 kV feeder exits, a bulk substation, three primary substations and overhead transmission connections are planned. The federal referral describes three planned data halls of up to 200 MW of IT capacity each.
Capacity
Planned / designDevelopment
1 phases · 2 milestonesProject-wide phase for IREN Bundey AI Data Center Campus; capacity class is it load.
Infrastructure
600 MW
The federal referral describes three planned data halls of up to 200 MW of IT capacity each.
Four 330 kV feeder exits, a bulk substation, three primary substations and overhead transmission connections are planned.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.