IREN Bundey AI Data Center Campus

Bundey, South Australia, AustraliaPreconstruction
Capacity
800 MW
Planned / design
Lead participant
IREN
Developer
Last updated
Aug 27, 2026
Most recent public record update

About IREN Bundey AI Data Center Campus

IREN is planning a large data center campus near Bundey in South Australia. The federal environmental referral describes three data halls of up to 200 MW of IT capacity each within an 800 MW site connection and a six-to-eight-year staged build. IREN is associated with the development in Bundey, Mid Murray Council area, South Australia, AU. The disclosed development scope includes 600 MW planned IT load across three halls; 800 MW site connection envelope; federal environmental referral under review; energization planned from 2028. Power and physical infrastructure include four 330 kV feeder exits, a bulk substation, three primary substations and overhead transmission connections are planned. The federal referral describes three planned data halls of up to 200 MW of IT capacity each.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design800 MWDesign · IREN Bundey AI Data Center Campus
It Load600 MWDesign · IREN Bundey AI Data Center Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for IREN Bundey AI Data Center Campus; capacity class is it load.

Aug 13, 2026
IREN South Australia Campus development disclosed
Completed
Transmission connection secured; federal environmental referral open for review
Forecast

Infrastructure

Electric GridPlanned Or Represented

600 MW

The federal referral describes three planned data halls of up to 200 MW of IT capacity each.

Site FacilityPlanned Or Represented

Four 330 kV feeder exits, a bulk substation, three primary substations and overhead transmission connections are planned.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
IREN Bundey campus | South Australia | Australia
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
800 MW
Design
Capacity Basis
IREN describes an 800 MW campus with a secured connection agreement.
Actual
Location Context
IREN Bundey campus | South Australia | Australia
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
600 MW
Design
Capacity Basis
The federal referral describes three planned data halls of up to 200 MW of IT capacity each.
Actual
Development Scale
600 MW planned IT load across three halls
Actual
Development Milestone
800 MW site connection envelope
Actual
Power Arrangement
Federal environmental referral under review
Actual
Site Configuration
Energization planned from 2028.
Actual