Cartis diligence evidence schedule
Hut 8 River Bend AI Data Center Campus
PRJ-0734 · Site · St. Francisville, Louisiana, United States
Captured 2026-09-06T04:13:20.744Z · Record last updated 2026-08-27
SHA-256: b94683290f02d2b107a879f9bfe69e33aee79403cc8ca660709fe60c7661d53a
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
Hut 8 is building a turnkey AI data center and related substation at River Bend in St. Francisville. The project is sized for 245 MW of contracted critical IT capacity. Hut 8 and Fluidstack is publicly identified in the project record for St. Francisville, West Feliciana Parish, LA, US. The disclosed development record includes 245 MW contracted critical IT; purpose-built data center and related substation; 15-year lease with Fluidstack. Power and infrastructure include turnkey high-density data center with dedicated substation infrastructure. Hut 8 reports a 245 MW critical IT turnkey development at River Bend. The initial lease carries an approximately $7.0 billion base-term contract value; Hut 8 later disclosed $3.25 billion of project notes for construction and substation infrastructure.
Headline: 245 MW Contracted
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Location Context · River Bend campus | St. Francisville | Louisiana
actual · Hut 8 River Bend AI Data Center Campus (project)
Claim 58783 · Review: Approved · Claim date: Not published
- Hut 8 Form 8-K — River Bend financing
Hut 8 · Document date: 2026-04-16 · Primary
https://www.sec.gov/Archives/edgar/data/1964789/000110465926049090/tm2612485d1_8k.htm
Lifecycle Status · Construction
actual · Hut 8 River Bend AI Data Center Campus (project)
Claim 58784 · Review: Approved · Claim date: Not published
- Hut 8 Form 8-K — River Bend financing
Hut 8 · Document date: 2026-04-16 · Primary
https://www.sec.gov/Archives/edgar/data/1964789/000110465926049090/tm2612485d1_8k.htm
Reported Capacity · 245 MW
actual · Hut 8 River Bend AI Data Center Campus (project)
Claim 58785 · Review: Approved · Claim date: Not published
Headline treatment: Selected headline
- Hut 8 Form 8-K — River Bend financing
Hut 8 · Document date: 2026-04-16 · Primary
https://www.sec.gov/Archives/edgar/data/1964789/000110465926049090/tm2612485d1_8k.htm
Capacity Basis · Hut 8 reports a 245 MW critical IT turnkey development at River Bend.
actual · Hut 8 River Bend AI Data Center Campus (project)
Claim 58786 · Review: Approved · Claim date: Not published
- Hut 8 Form 8-K — River Bend financing
Hut 8 · Document date: 2026-04-16 · Primary
https://www.sec.gov/Archives/edgar/data/1964789/000110465926049090/tm2612485d1_8k.htm
Development Scale · 245 MW contracted critical IT
actual · Hut 8 River Bend AI Data Center Campus (project)
Claim 107636 · Review: Approved · Claim date: Not published
- River Bend campus profile
Hut 8 · Document date: 2026-08-01 · Corroborating
https://www.hut8.com/data-centers/river-bend - Hut 8 Form 8-K — River Bend financing
Hut 8 · Document date: 2026-04-16 · Primary
https://www.sec.gov/Archives/edgar/data/1964789/000110465926049090/tm2612485d1_8k.htm
Development Milestone · Purpose built data center and related substation
actual · Hut 8 River Bend AI Data Center Campus (project)
Claim 107637 · Review: Approved · Claim date: Not published
- River Bend campus profile
Hut 8 · Document date: 2026-08-01 · Corroborating
https://www.hut8.com/data-centers/river-bend - Hut 8 Form 8-K — River Bend financing
Hut 8 · Document date: 2026-04-16 · Primary
https://www.sec.gov/Archives/edgar/data/1964789/000110465926049090/tm2612485d1_8k.htm
Power Arrangement · 15-Year lease with Fluidstack.
actual · Hut 8 River Bend AI Data Center Campus (project)
Claim 107638 · Review: Approved · Claim date: Not published
- River Bend campus profile
Hut 8 · Document date: 2026-08-01 · Corroborating
https://www.hut8.com/data-centers/river-bend - Hut 8 Form 8-K — River Bend financing
Hut 8 · Document date: 2026-04-16 · Primary
https://www.sec.gov/Archives/edgar/data/1964789/000110465926049090/tm2612485d1_8k.htm
Boundary Context · River Bend campus | St. Francisville | Louisiana
actual · Hut 8 River Bend AI Data Center Campus (project)
Claim 107639 · Review: Approved · Claim date: Not published
- River Bend campus profile
Hut 8 · Document date: 2026-08-01 · Corroborating
https://www.hut8.com/data-centers/river-bend - Hut 8 Form 8-K — River Bend financing
Hut 8 · Document date: 2026-04-16 · Primary
https://www.sec.gov/Archives/edgar/data/1964789/000110465926049090/tm2612485d1_8k.htm
Counterparties and capital
Fluidstack · Tenant · CMP-1471
Hut 8 · Developer · CMP-1416
$3,250,000,000 · 2026-07-01
Construction of 245 MW critical IT data center and substation infrastructure.
Metrobloks (Sponsor)
Financing record 207; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.