Milan metropolitan area, 25, ItalyUnder construction
Capacity
120 MW
Planned / design
Lead participant
HSCALE
Developer · Operator
Last updated
Sep 1, 2026
Most recent public record update

About HSCALE Milan MXP2

MXP2 is a planned three-building Milan campus targeting Q3 2028. HSCALE Milan MXP2 is located in Milan metropolitan area, 25, IT and is a data center campus in under construction status. Participants include HSCALE as developer, HSCALE as operator. Published specifications include 120 MW of planned capacity, 36 MW of stated capacity, 12 MW of stated capacity. Development comprises MXP2 Building 1 (preconstruction), MXP2 Building 2 (preconstruction), MXP2 Building 3 (preconstruction). Key milestones include MXP2 site control announced (2026-05-20) and MXP2 target ready for service (2028-09-30). grid connection capacity — 180 MVA: HSCALE states STMG secured and STMD submitted; utility and documentary status remain open. liquid ready cooling: Air, direct-liquid or hybrid cooling supported by base design; operator-specific energy arrangement not yet public.

Program relationships

1 linked

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential120 MWActual · HSCALE Milan MXP2

Development

3 phases · 2 milestones
MXP2 Building 1Announced Or Preconstruction

HSCALE states 36 MW per building but does not publish an authoritative building schedule or capacity definition.

1 building

MXP2 Building 2Announced Or Preconstruction

HSCALE states 36 MW per building but does not publish an authoritative building schedule or capacity definition.

1 building

MXP2 Building 3Announced Or Preconstruction

HSCALE states 36 MW per building but does not publish an authoritative building schedule or capacity definition.

1 building

May 20, 2026
MXP2 site control announced
Completed
Sep 30, 2028
MXP2 target ready for service
Forecast

Infrastructure

Electric GridSecured Or Contracted

180 MVA

HSCALE states STMG secured and STMD submitted; utility and documentary status remain open.

Cooling SystemPlanned Or Represented

Air, direct-liquid or hybrid cooling supported by base design; operator-specific energy arrangement not yet public.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

7 facts
Company Stated Planned Campus Capacity
120 MW
Actual
Planned Building Count
3
Actual
Target Ready For Service
2028-Q3
Actual
Target Annual Pue
1.2
Actual
Electrical Topology
N+1
Actual
Cooling Topology
N+2; liquid ready
Actual
Secured Grid Capacity Company Claim
180 MVA
Actual