Green Mountain SVG1 Rennesøy
- Planned critical IT
- 25 MW
- Updated
- Oct 28, 2026
Green Mountain's original Rennesøy facility has operated since 2013 inside a former NATO ammunition-storage complex. A 2024 impact report describes about 16.5 MW of capacity, while the current site page markets a 25 MW maximum across six mountain halls.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
6 buildings
Six mountain halls each contain two-story concrete buildings.
1 building
Customer unnamed; later doubling project must not be assumed to be a separate additive scope without reconciliation.
1 building
Potential relationship to the 2020 doubling plan remains to be reconciled.
Customer deployment, not a new site or necessarily additive to the 2024 installed total.
Milestones (5)
2011 · Recorded actual event
Completed · Construction started
Source not linked2013 · Recorded actual event
Completed · Commercial operation
Source not linkedSep 21, 2020 · Recorded actual event
Completed · Capacity revised
Source not linkedMay 12, 2021 · Recorded actual event
Completed · Capacity revised
Source not linkedNov 3, 2022 · Recorded actual event
Completed · Customer commitment
Source not linkedParticipants
Owner
Sources by role
Owner (1)
- Green Mountain Data Centers to be acquired by Azrieli Group Ltd. · Jul 19, 2021 · Primary
Operator
Sources by role
Operator (1)
- Economic Impact Report — SVG-Rennesøy Data Center · Nov 1, 2024 · Corroborating
Operator (1)
- SVG-Rennesøy · Primary
Customer
Sources by role
Customer (1)
- The Volkswagen Group expands capacity at Green Mountain · Nov 3, 2022 · Primary
Site & development
Technical specifications
Additional project facts
Infrastructure & permits
Technical details (5)
Operational
16.5 MW
Approximate site capacity in November 2024 impact report.
Partially operational
25 MW
Current site maximum; not the dated installed state.
Operational
3 independent feeds
Each supply is fed from multiple hydropower plants.
Operational
1.18 PUE
Current operator average.
Operational
8 degrees C
Deep-fjord source enters by gravity and exchanges heat with a closed fresh-water loop.