Skip to content
← Return to profile

Cartis diligence evidence schedule

Green Mountain OSL-Hamar Data Center Campus

PRJ-0795 · Site · Hamar, Innlandet, Norway

Captured 2026-09-06T04:13:13.631Z · Record last updated 2026-08-28

SHA-256: 4dd6fd91927853c7289b9fedd7e98c2164822cea0355b5ab667b9f2adc31fc00

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

Green Mountain OSL-Hamar Data Center Campus, also known as Green Mountain OSL-Hamar, is a data center project in Hamar, Innlandet, NO associated with Green Mountain. Three completed 30 MW buildings provide 90 MW operating capacity; two additional 30 MW buildings are planned for a 150 MW site envelope. Single-tenant TikTok campus using renewable hydropower, dual grid supplies, free cooling and heat-reuse-ready systems. Disclosed investment or financing context is recorded with its transaction scope and is not treated as delivered project cost or proof of capacity.

Headline: 90 MW Planned / design

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Location Context · Green Mountain OSL-Hamar | Hamar | Innlandet | NO

actual · Green Mountain OSL-Hamar Data Center Campus (project)

Claim 61052 · Review: Approved · Claim date: Not published

  1. Green Mountain Green Mountain OSL-Hamar profile

    Green Mountain · Document date: 2026-08-27 · Primary

    https://greenmountain.no/data-center/osl-hamar/

Lifecycle Status · Operational

actual · Green Mountain OSL-Hamar Data Center Campus (project)

Claim 61053 · Review: Approved · Claim date: Not published

  1. Green Mountain Green Mountain OSL-Hamar profile

    Green Mountain · Document date: 2026-08-27 · Primary

    https://greenmountain.no/data-center/osl-hamar/

Reported Capacity · 90 MW

design · Green Mountain OSL-Hamar Data Center Campus (project)

Claim 61054 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. Green Mountain Green Mountain OSL-Hamar profile

    Green Mountain · Document date: 2026-08-27 · Primary

    https://greenmountain.no/data-center/osl-hamar/

Capacity Basis · Green Mountain states that three completed buildings are in operation and together provide 90 MW of capacity.

actual · Green Mountain OSL-Hamar Data Center Campus (project)

Claim 61055 · Review: Approved · Claim date: Not published

  1. Green Mountain Green Mountain OSL-Hamar profile

    Green Mountain · Document date: 2026-08-27 · Primary

    https://greenmountain.no/data-center/osl-hamar/

Location Context · Green Mountain OSL-Hamar | Hamar | Innlandet | NO

actual · Green Mountain OSL-Hamar Data Center Campus (project)

Claim 101016 · Review: Approved · Claim date: Not published

  1. Green Mountain Green Mountain OSL-Hamar profile

    Green Mountain · Document date: 2026-08-27 · Primary

    https://greenmountain.no/data-center/osl-hamar/

Lifecycle Status · Operating

actual · Green Mountain OSL-Hamar Data Center Campus (project)

Claim 101017 · Review: Approved · Claim date: Not published

  1. Green Mountain Green Mountain OSL-Hamar profile

    Green Mountain · Document date: 2026-08-27 · Primary

    https://greenmountain.no/data-center/osl-hamar/

Reported Capacity · 90 MW

Planned / design or future potential · Green Mountain OSL-Hamar Data Center Campus (project)

Claim 101018 · Review: Approved · Claim date: Not published

Headline treatment: Selected headline

  1. Green Mountain Green Mountain OSL-Hamar profile

    Green Mountain · Document date: 2026-08-27 · Primary

    https://greenmountain.no/data-center/osl-hamar/

Capacity Basis · 90 MW facility or campus design capacity.

actual · Green Mountain OSL-Hamar Data Center Campus (project)

Claim 101019 · Review: Approved · Claim date: Not published

  1. Green Mountain Green Mountain OSL-Hamar profile

    Green Mountain · Document date: 2026-08-27 · Primary

    https://greenmountain.no/data-center/osl-hamar/

Operating Buildings · 3

actual · Green Mountain OSL-Hamar Data Center Campus (project)

Claim 101021 · Review: Approved · Claim date: Not published

  1. OSL-Hamar construction economic-impact analysis

    Menon Economics / Green Mountain · Document date: 2025-01-01 · Primary

    https://greenmountain.no/wp-content/uploads/Report-Economic-Impact-Analysis-of-OSL-Hamar-Construction-english.pdf

Reported Investment · 9,700,000,000 NOK

transaction scope · Green Mountain OSL-Hamar Data Center Campus (project)

Claim 101023 · Review: Approved · Claim date: Not published

  1. OSL-Hamar construction economic-impact analysis

    Menon Economics / Green Mountain · Document date: 2025-01-01 · Primary

    https://greenmountain.no/wp-content/uploads/Report-Economic-Impact-Analysis-of-OSL-Hamar-Construction-english.pdf

Counterparties and capital

Green Mountain · Developer · CMP-1230

TikTok · Tenant · CMP-0072

Investment Commitment

NOK 9,700,000,000 · 2025-03-26

Economic-impact report estimate for three completed buildings; not a debt or equity financing close.

Green Mountain (Borrower)

Financing record 196; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.