The Gouldsboro Data Center record tracks a proposed campus in Pennsylvania associated with 1778 Rich Pike LLC. Public planning evidence supports the site-development identity, but the tracked 1.5 GW figure is not verified as operating, contracted or phase-specific design capacity. Legal ownership, end user, building count, utility interconnection, water, land-use approvals, air permits, financing and schedule remain unresolved.

Capacity

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Identity, entitlement and utility verificationAnnounced or preconstruction

The Gouldsboro Data Center record tracks a proposed campus in Pennsylvania associated with 1778 Rich Pike LLC. Public planning evidence supports the site-development identity, but the tracked 1.5 GW figure is not verified as operating, contracted or phase-specific design capacity. The available public sources do not establish a single project-scoped capacity figure. Legal ownership, end user, building count, utility interconnection, water, land-use approvals, air permits, financing and schedule remain unresolved.

Participants

1778 Rich Pike LLC

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Gouldsboro Data Center | Clifton Township | Pennsylvania | US

Source

Location context

Actual

Gouldsboro Data Center | Clifton Township | Pennsylvania | US

Source

Location context

Actual

Gouldsboro, Pennsylvania

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

1,500 MW future full build site capacity; not measured operating IT load.

Source

Lifecycle status

Actual

Proposed

Source

Legal entity

Actual

1778 Rich Pike LLC

Source

Capacity status

Actual

1.5 GW remains unverified

Source

Infrastructure & permits

Technical details (1)
Electric grid

Unknown

1,500 MW

Secondary estimate; headline withheld.