Data center siteSite record

Google Cerrillos Data Center

Cerrillos, RM, ChileStatus Under Review
Capacity
No public figure
Lead participant
Google
Developer
Last updated
Aug 25, 2026
Most recent public record update

About Google Cerrillos Data Center

Separate two-building Santiago proposal. Original water-cooled regulatory path was withdrawn in 2024; Google promised a new air-cooled filing at the same site. Google Cerrillos Data Center is in Cerrillos, RM, CL and is a data center campus with predevelopment status. Participants include Google LLC as developer. Development comprises Original water-cooled project (withdrawn), Promised air-cooled successor project (predevelopment). Key milestones include Court partially annuls approval and suspends execution. (2024-02-26) and Google withdraws original process and promises new air-cooled filing. (2024-09-17). onsite substation and underground line: Original project included a substation and underground double-circuit line. groundwater cooling system: Original cooling towers and three groundwater wells; central climate/water issue. Permitting includes environmental approval for Cerrillos RCA 127/2020 (partially annulled suspended then process withdrawn) and environmental judicial review for R-271-2020 / R-270-2020 judicial review (judgment issued).

Program relationships

1 linked

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

2 phases · 5 milestones
Original water-cooled projectChanged Or Cancelled

Original environmental design is no longer an executable project approval.

2 buildings

Promised air-cooled successor projectAnnounced Or Preconstruction

Same site; new primary filing not located by cutoff.

Jul 15, 2019
Original Cerrillos environmental declaration filed
Completed
Jan 1, 2020
Original project receives RCA 127/2020
Completed
Feb 16, 2022
Air-cooling modification submitted as pertinence query
Completed
Feb 26, 2024
Court partially annuls approval and suspends execution
Completed
Sep 17, 2024
Google withdraws original process and promises new air-cooled filing
Completed

Infrastructure

Electric GridCancelled Or Not Proceeding

Original project included a substation and underground double-circuit line.

Cooling SystemCancelled Or Not Proceeding

Original cooling towers and three groundwater wells; central climate/water issue.

Cooling SystemPlanned Or Represented

New filing promised; detailed current design not publicly disclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 2

Facts & sources

Published claims and their source links.

4 facts
Original Data Center Buildings
2
Fact
Original Cooling
Groundwater based cooling towers
Fact
Original Approval
RCA 127/2020 partially annulled and suspended
Fact
Permit Process Withdrawal
2024-09-17
Actual