Cartis diligence evidence schedule

Equinix RJ3 Rio de Janeiro

PRJ-0046 · Site · Rua Maria Soares Sendas, Area 6 B2, Parque Barreto, São João de Meriti, RJ, Brazil

Captured 2026-09-06T04:13:36.870Z · Record last updated 2026-08-22

SHA-256: b7e129bdba8e42a4923f03caa5d3f78507f7f7f5838c3fc7192a9ebd03820d82

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

Equinix opened RJ3 in São João de Meriti in April 2025. Phase 1 provides roughly 550–560 cabinets and about 1,470–1,490 square metres of colocation; Phase 2 is scheduled for Q4 2026.

Headline:

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Project Status · Phase 1 operating; Phase 2 planned

Planned / design or future potential · Equinix RJ3 Rio de Janeiro (project)

Claim 6048 · Review: Approved · Claim date: 2025-04-08T00:00:00+00:00

  1. Latin America Is Equinix’s Fastest-Growing and Most Dynamic Region

    Equinix · Document date: 2026-05-26 · Corroborating

    https://newsroom.equinix.com/2026-05-26-America-Latina-e-a-regiao-de-maior-crescimento-e-mais-dinamica-para-a-Equinix
  2. Equinix Launches Latest Data Center in Rio de Janeiro, Brazil

    Data Center Dynamics · Document date: 2025-04-10 · Corroborating

    https://www.datacenterdynamics.com/en/news/equinix-launches-latest-data-center-in-rio-de-janeiro-brazil/
  3. Rio de Janeiro RJ3 IBX Data Center

    Equinix · Document date: Not published · Primary

    https://www.equinix.com/data-centers/americas-colocation/brazil-colocation/rio-de-janeiro-data-centers/rj3

Opening Date · 2025-04-08

actual · Phase 1 (phase)

Claim 6049 · Review: Approved · Claim date: 2025-04-10T00:00:00+00:00

  1. Equinix Launches Latest Data Center in Rio de Janeiro, Brazil

    Data Center Dynamics · Document date: 2025-04-10 · Primary

    https://www.datacenterdynamics.com/en/news/equinix-launches-latest-data-center-in-rio-de-janeiro-brazil/

Colocation Space · 1,490 sq m

actual · Phase 1 (phase)

Claim 6051 · Review: Approved · Claim date: Not published · Supersedes 6050

  1. Rio de Janeiro RJ3 IBX Data Center

    Equinix · Document date: Not published · Primary

    https://www.equinix.com/data-centers/americas-colocation/brazil-colocation/rio-de-janeiro-data-centers/rj3

Cabinet Capacity · >550 cabinets

reported rounded · Phase 1 (phase)

Claim 6053 · Review: Approved · Claim date: 2026-05-26T00:00:00+00:00 · Supersedes 6052

  1. Latin America Is Equinix’s Fastest-Growing and Most Dynamic Region

    Equinix · Document date: 2026-05-26 · Primary

    https://newsroom.equinix.com/2026-05-26-America-Latina-e-a-regiao-de-maior-crescimento-e-mais-dinamica-para-a-Equinix

Planned Cabinet Capacity · 550 cabinets

Planned / design or future potential · Phase 2 (phase)

Claim 6056 · Review: Approved · Claim date: Not published

  1. Equinix 2025 Form 10-K

    Equinix / U.S. Securities and Exchange Commission · Document date: Not published · Primary

    https://www.sec.gov/Archives/edgar/data/1101239/000110123926000032/eqix-20251231.htm

Ready For Service Target · 2026-Q4

Planned / design or future potential · Phase 2 (phase)

Claim 6057 · Review: Approved · Claim date: Not published

  1. Equinix 2025 Form 10-K

    Equinix / U.S. Securities and Exchange Commission · Document date: Not published · Primary

    https://www.sec.gov/Archives/edgar/data/1101239/000110123926000032/eqix-20251231.htm

Estimated Capital Expenditure · $46,000,000

transaction scope · Phase 2 (phase)

Claim 6058 · Review: Approved · Claim date: Not published

  1. Equinix 2025 Form 10-K

    Equinix / U.S. Securities and Exchange Commission · Document date: Not published · Primary

    https://www.sec.gov/Archives/edgar/data/1101239/000110123926000032/eqix-20251231.htm

Building Description · Three story precast concrete

actual · Equinix RJ3 Rio de Janeiro (project)

Claim 6059 · Review: Approved · Claim date: Not published

  1. Rio de Janeiro RJ3 IBX Data Center

    Equinix · Document date: Not published · Primary

    https://www.equinix.com/data-centers/americas-colocation/brazil-colocation/rio-de-janeiro-data-centers/rj3

Power Redundancy · N+1

design · Equinix RJ3 Rio de Janeiro (project)

Claim 6060 · Review: Approved · Claim date: Not published

  1. Rio de Janeiro RJ3 IBX Data Center

    Equinix · Document date: Not published · Primary

    https://www.equinix.com/data-centers/americas-colocation/brazil-colocation/rio-de-janeiro-data-centers/rj3

Cooling Redundancy · N+20%

design · Equinix RJ3 Rio de Janeiro (project)

Claim 6061 · Review: Approved · Claim date: Not published

  1. Rio de Janeiro RJ3 IBX Data Center

    Equinix · Document date: Not published · Primary

    https://www.equinix.com/data-centers/americas-colocation/brazil-colocation/rio-de-janeiro-data-centers/rj3

Minimum Cabinet Density · 6 kVA

reported rounded · Equinix RJ3 Rio de Janeiro (project)

Claim 6062 · Review: Approved · Claim date: Not published

  1. Rio de Janeiro RJ3 IBX Data Center

    Equinix · Document date: Not published · Primary

    https://www.equinix.com/data-centers/americas-colocation/brazil-colocation/rio-de-janeiro-data-centers/rj3

Interfacility Fiber · Redundant fiber ring to RJ2 approximately 17 km away

actual · Equinix RJ3 Rio de Janeiro (project)

Claim 6063 · Review: Approved · Claim date: 2024-11-29T00:00:00+00:00

  1. Inside RJ3, Our New Data Center in Rio de Janeiro

    Equinix Blog · Document date: 2024-11-29 · Primary

    https://blog.equinix.com/blog/2024/11/29/por-dentro-do-rj3-nosso-novo-data-center-no-rio-de-janeiro/

It Capacity ·

proposal · Equinix RJ3 Rio de Janeiro (project)

Claim 6064 · Review: Approved · Claim date: Not published

  1. Latin America Is Equinix’s Fastest-Growing and Most Dynamic Region

    Equinix · Document date: 2026-05-26 · Corroborating

    https://newsroom.equinix.com/2026-05-26-America-Latina-e-a-regiao-de-maior-crescimento-e-mais-dinamica-para-a-Equinix
  2. With a USD 94 Million Investment, Equinix Announces Its Third Data Center in Rio de Janeiro

    Equinix · Document date: 2024-05-23 · Corroborating

    https://equinix.mediaroom.com/Com-investimento-de-US-94-milhoes%2C-Equinix-anuncia-seu-terceiro-data-center-no-Rio-de-Janeiro
  3. Rio de Janeiro RJ3 IBX Data Center

    Equinix · Document date: Not published · Primary

    https://www.equinix.com/data-centers/americas-colocation/brazil-colocation/rio-de-janeiro-data-centers/rj3
  4. Equinix 2025 Form 10-K

    Equinix / U.S. Securities and Exchange Commission · Document date: Not published · Corroborating

    https://www.sec.gov/Archives/edgar/data/1101239/000110123926000032/eqix-20251231.htm

Counterparties and capital

Equinix, Inc. · Owner · CMP-0222

Municipality of São João de Meriti · Government Authority · CMP-0223

Investment Commitment

$94,000,000 · 2024-05-23

Original Phase 1/project investment; conflicts with later approximately USD 45 million official description.

Equinix, Inc. (Sponsor)

Financing record 38; claim-specific source links appear in the exhibit sources where published.

Investment Commitment

$45,000,000 · 2026-05-26

Later approximately USD 45 million initial-investment wording; unresolved against USD 94 million and never summed.

Equinix, Inc. (Sponsor)

Financing record 39; claim-specific source links appear in the exhibit sources where published.

Investment Commitment

$46,000,000 · Date not published

Phase 2 estimated capex in 2025 Form 10-K; forecast, not realized spend.

Equinix, Inc. (Sponsor)

Financing record 40; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.