EdgeConneX Austin AUS01–04 Cedar Creek Campus

Cedar Creek, Texas, United StatesPreconstruction
Evidence
Planned / design
336 MW
Updated
Oct 29, 2026

EdgeConneX’s Austin AUS01–04 campus at 6752 FM 535 in Cedar Creek has 336 MW of initial power potential, not verified operating IT load. The operator targets a first phase in 2027. Aqua names subsidiary DFW33220N, LLC in a standard water-service agreement and says service had not begun on June 25, 2026. Its maximum 210 gallons per minute for 350 living unit equivalents is not consumption. The 2027 service forecast depended on developer-funded upgrades; later activation remains unverified. AUS02’s $440 million construction estimate is building-specific, not campus financing.

Capacity

Planned campus capacity MW

Planned / design or future potential

336 MW

Source

Aus01 planned power capacity MW

Planned / design or future potential

96 MW

Source

Aus02 planned power capacity MW

Planned / design or future potential

48 MW

Source

Aus03 planned power capacity MW

Planned / design or future potential

96 MW

Source

Aus04 planned power capacity MW

Planned / design or future potential

96 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

AUS01 initial phasePlanned

1 building

96 MW power with 2027 target, not confirmed IT. Evidence: SRC-N220-EDGECONNEX-CEDAR-CREEK-S1

AUS02 to AUS04Planned

3 buildings

48 + 96 + 96 MW power within 336 MW total. Evidence: SRC-N220-EDGECONNEX-CEDAR-CREEK-S1

Milestones (4)
AU02 tax qualification effective date.

Jul 11, 2025 · Recorded actual event

Completed · Announced

Sources (1)
AUS02 accessibility project registration.

Jul 14, 2025 · Recorded actual event

Completed · Announced

Sources (1)
Aqua confirmed executed water-service agreement, service not yet begun.

Jun 25, 2026 · Recorded actual event

Completed · Announced

Sources (1)
First 96 MW phase target; achievement not verified.

2027 · Forecast / planned record

Forecast · Announced

Sources (1)

Participants

EdgeConneX

Developer · Operator

Sources by role
Developer / Operator (1)

Capital & incentives

Capital claims

Qualified data center tax record

Reported rounded

Texas Comptroller lists qualified facility/building; not a cash grant or full campus occupancy proof.

Source

Site & development

Site location

Reported rounded

6752 FM535, Cedar Creek 78612; operator describes 130 acres. AUS02 registration also uses 8001 Wolf Lane Building 2.

Source

Technical specifications

Reviewed ecx water role scope context

Reported rounded

Aqua WSC’s June 25, 2026 statement identifies DFW33220N, LLC as an EdgeConneX subsidiary and the agreement location as 6752 FM 535. It describes a standard large volume water service agreement, expressly rejecting a strategic partner, co developer or project stakeholder role. Its service scope and maximum flow are not measured consumption, annual allocation or cooling demand. Service had not begun as of that statement; the 2027 forecast depended on required infrastructure upgrades funded entirely by EdgeConneX, and later activation has not been verified.

Source

Infrastructure & permits

Technical details (4)
Utility service

Reported context

N+1 UPS/PDU/generator design; operating utility feed unverified.

Cooling system

Reported context

N+1 CRAC units described; Aqua agreement allows 350 LUEs/max 210 gpm, with service expected 2027 after developer-funded upgrades.

Fiber

Reported context

Diverse building entries and conduits to separate meet-me rooms.

Water supply

Reported context

Aqua executed service agreement permits 350 LUEs/max 210 gpm; service had not begun June 25, 2026 and was expected in 2027 after developer-funded upgrades.

Other · Documented

EdgeConneX Austin AUS01–04 Cedar Creek Campus

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.