EcoDataCenter 2 Borlänge AI Campus

PRJ-0716 · Site · Borlänge, Dalarna County, Sweden

Record last updated Oct 28, 2026

Scope and capacity

EcoDataCenter announced Mistral AI as a partner for its Borlänge development on February 11, 2026, and Bravida announced an additional building-installation contract in July. The contractor’s first-quarter 2028 timetable concerns that additional building, not necessarily the entire campus. EcoDataCenter has started construction of its Kvarnsveden mega campus in Borlänge. The site will have access to 250 MW at launch, with potential to scale to 600 MW. EcoDataCenter is associated with the development in Borlänge, Borlänge Municipality, Dalarna County, SE. The disclosed development scope includes 250 MW launch power access; up to 600 MW future scale; first data center targeted for early 2027. Power and physical infrastructure include brownfield paper-mill redevelopment with large-scale Nordic power access. EcoDataCenter states the site will have access to 250 MW at launch.

Headline: 250 MW Utility capacity

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Location context · EcoDataCenter 2 | Kvarnsveden | Borlänge | Sweden

Actual · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 58004 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Lifecycle status · Construction

Actual · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 58005 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Reported capacity · 250 MW

Design · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 58006 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Separate claim, not added to the headline

  1. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Capacity basis · EcoDataCenter states the site will have access to 250 MW at launch.

Actual · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 58007 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Location context · EcoDataCenter 2 | Kvarnsveden | Borlänge | Sweden

Actual · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 111491 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Lifecycle status · Construction

Actual · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 111492 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Reported capacity · 250 MW

Design · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 111493 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Selected headline

  1. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Capacity basis · EcoDataCenter states the site will have access to 250 MW at launch.

Actual · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 111494 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Development scale · 250 MW launch power access

Actual · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 111511 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Borlange environmental consultation material

    Borlange Energi · Document date: Nov 1, 2025 · Corroborating

    Source reference: SRC-6264 · Government record · Recorded authority: Official primary

    Source URL

    https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf

  2. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Development milestone · Up to 600 MW future scale

Actual · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 111512 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Borlange environmental consultation material

    Borlange Energi · Document date: Nov 1, 2025 · Corroborating

    Source reference: SRC-6264 · Government record · Recorded authority: Official primary

    Source URL

    https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf

  2. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Power arrangement · First data center targeted for early 2027.

Actual · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 111513 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Borlange environmental consultation material

    Borlange Energi · Document date: Nov 1, 2025 · Corroborating

    Source reference: SRC-6264 · Government record · Recorded authority: Official primary

    Source URL

    https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf

  2. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Site configuration · EcoDataCenter 2 | Kvarnsveden | Borlänge | Sweden

Actual · EcoDataCenter 2 Borlänge AI Campus (Project)

Claim 111514 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Borlange environmental consultation material

    Borlange Energi · Document date: Nov 1, 2025 · Corroborating

    Source reference: SRC-6264 · Government record · Recorded authority: Official primary

    Source URL

    https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf

  2. EcoDataCenter breaks ground on mega campus in Borlänge

    EcoDataCenter · Document date: Sep 24, 2025 · Primary

    Source reference: SRC-2533

    Source URL

    https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556

Counterparties and capital

EcoDataCenter · Developer · CMP-0093

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.