Cartis diligence evidence schedule
EcoDataCenter 2 Borlänge AI Campus
PRJ-0716 · Site · Borlänge, Dalarna County, Sweden
Record last updated Oct 28, 2026
Scope and capacity
EcoDataCenter announced Mistral AI as a partner for its Borlänge development on February 11, 2026, and Bravida announced an additional building-installation contract in July. The contractor’s first-quarter 2028 timetable concerns that additional building, not necessarily the entire campus. EcoDataCenter has started construction of its Kvarnsveden mega campus in Borlänge. The site will have access to 250 MW at launch, with potential to scale to 600 MW. EcoDataCenter is associated with the development in Borlänge, Borlänge Municipality, Dalarna County, SE. The disclosed development scope includes 250 MW launch power access; up to 600 MW future scale; first data center targeted for early 2027. Power and physical infrastructure include brownfield paper-mill redevelopment with large-scale Nordic power access. EcoDataCenter states the site will have access to 250 MW at launch.
Headline: 250 MW Utility capacity
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (12)
Location context · EcoDataCenter 2 | Kvarnsveden | Borlänge | Sweden
Actual · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 58004 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Lifecycle status · Construction
Actual · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 58005 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Reported capacity · 250 MW
Design · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 58006 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
Headline treatment: Separate claim, not added to the headline
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Capacity basis · EcoDataCenter states the site will have access to 250 MW at launch.
Actual · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 58007 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Location context · EcoDataCenter 2 | Kvarnsveden | Borlänge | Sweden
Actual · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 111491 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Lifecycle status · Construction
Actual · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 111492 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Reported capacity · 250 MW
Design · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 111493 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
Headline treatment: Selected headline
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Capacity basis · EcoDataCenter states the site will have access to 250 MW at launch.
Actual · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 111494 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Development scale · 250 MW launch power access
Actual · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 111511 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Borlange environmental consultation material
Borlange Energi · Document date: Nov 1, 2025 · Corroborating
Source reference: SRC-6264 · Government record · Recorded authority: Official primary
Source URL
https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf
https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Development milestone · Up to 600 MW future scale
Actual · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 111512 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Borlange environmental consultation material
Borlange Energi · Document date: Nov 1, 2025 · Corroborating
Source reference: SRC-6264 · Government record · Recorded authority: Official primary
Source URL
https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf
https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Power arrangement · First data center targeted for early 2027.
Actual · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 111513 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Borlange environmental consultation material
Borlange Energi · Document date: Nov 1, 2025 · Corroborating
Source reference: SRC-6264 · Government record · Recorded authority: Official primary
Source URL
https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf
https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Site configuration · EcoDataCenter 2 | Kvarnsveden | Borlänge | Sweden
Actual · EcoDataCenter 2 Borlänge AI Campus (Project)
Claim 111514 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Borlange environmental consultation material
Borlange Energi · Document date: Nov 1, 2025 · Corroborating
Source reference: SRC-6264 · Government record · Recorded authority: Official primary
Source URL
https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf
https://www.borlange-energi.se/download/18.5e7ed2a619a157ef82321e90/1762432920412/borlange-energi-undersokningssamrad.pdf
- EcoDataCenter breaks ground on mega campus in Borlänge
EcoDataCenter · Document date: Sep 24, 2025 · Primary
Source reference: SRC-2533
Source URL
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556
Counterparties and capital
EcoDataCenter · Developer · CMP-0093
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.